Who can be the CxA?
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Ron Dean on
I have two specific questions: 1. Just to confirm, is it necessary that the 2 projects of experience for the CxA are LEED certified (or persuing LEED)? 2.
Appropriate time for submitting the Preliminary Design Review
posted by Shivani Langer on
What would be the recommended time/phase during a New Construction project when one should submit the preliminary design review?
SSc6.2 form
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by Michele Otazua on
The credit form for SSc6.2 has apparently changed. The table 1 for TSS has been removed, and in its place a description of BMPs is required. Is this the case?
May 2011 Addenda - CFC Phaseout Plan
CI-2009 EAp3:Fundamental Refrigerant Managementposted by Michelle Ruda on
In the May 2011 Addenda to this credit, the references to a CFC Phaseout Plan have been removed. Specifically: Pg.
Recycling Design Guidelines for large projects
ND-v2009 GIBc16:Solid waste management infrastructureposted by Lauren Sparandara on
I am working on a project with many large buildings (man greater than 600,00 sf). I wanted to advise the client on how much area they should set aside for recycling.
Value input for “Measured outdoor airflow, CFM”
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Patricia Fuertes on
In this prerequisite we are following Case 1 and filling in details in the 2007UM-62MZ Calculator.
Design Engineer signature
CI-2009 EAp2:Minimum Energy Performanceposted by Maria Porter on
In a new build which is undergoing certification in CS and CI simultaneously; what person is the Design Engineer? The person who has to sign in EAp2?