uploading OPR and BOD in the LEED On-Line

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Benjie Herrera  on 

Who is allowed to upload the OPR and BOD in the LEED On-Line?When can we upload these documents ?

4
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue Apr 30, 2013, 11:11 pm

What is a self-reported course that qualifies for CMP

General forums
posted by  Todd Bundren  on 

The CMP guide lists self-reported courses as seperate from preferred courses and presentations form registered providers, does this mean we can report a course / presentation that hasn't been appro

3
Associate Principal - Director of Sustainabilty
Lawrence Group
LEEDuser Premium Member
10 thumbs up
Tue Apr 30, 2013, 6:56 pm

F-factor of slab for Proposed Design

NC-2009 EAp2:Minimum Energy Performance
posted by  Alicia Villanueva  on 

Dear alll, From a preliminary review, we received a comment regarding the Energy Modeling saying that the slab on grade floor of the proposed should be modeled using a F-factor, and not using the

7
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Tue Apr 30, 2013, 2:31 pm

Fan operation for System 6

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

For system 6 (Packaged VAV with reheat) are both the VAV fans in the AHUs and the CAV fans in the PFP boxes considered among the "supply and return fans"?

3
Tue Apr 30, 2013, 1:24 pm

EAp2 - Energy Performance Benchmark

General forums
posted by  Stefanie Hoffmann  on 

Hi all, we are working on a LEED EBOM project for a university building near Helsinki, Finland. At the moment we are struggling to fulfill the requirements of EAp2.

6
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Tue Apr 30, 2013, 6:57 am

Compliance Factor Over 0.18

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Adrianna Schneider  on 

The document sample I have states that the compliance factor is calculated by WindowArea/FloorArea * VLT And then checking if it is between 0.15 and 0.18. When it is less than .015, then the amo

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Mon Apr 29, 2013, 9:12 pm

new database

General forums
posted by  Lewis Hewton  on 

check out the new database! http://www.usgbc.org/leed-interpretations can anyone get this to work?

5
Default Avatar
Sustainable Design Coordinator
BOULDER ASSOCIATES
LEEDuser Basic Member
14 thumbs up
Mon Apr 29, 2013, 8:30 pm

EA Minimum Energy Performance - Star Rated Equipment

CI-2009 EAp2:Minimum Energy Performance
posted by  Anya Benkabbou  on 

Could an EPEAT Gold Cert equipment be considered equivalent to Energy Star qualified? Really appreciate clarification with this.

3
Associate
Ponte Mellor Architects, Ltd
LEEDuser Basic Member
0 thumbs up
Mon Apr 29, 2013, 7:15 pm

CxA Experience

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Ameet AA  on 

LEED online template/ form require the following: "Enter information for two projects commissioned by the CxA which are similar in scope and type to this LEED project building" I am working on L

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Apr 29, 2013, 6:39 pm

M&V Plan for Residential Project

NC-2009 EAc5:Measurement and Verification
posted by  Lauren Fakhoury  on 

Hi all, I'm working on a residential project where the tenants do NOT pay their utility bills.

3
Mon Apr 29, 2013, 3:04 pm