Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Percantage Make-Up

Healthcare-v2009 MRc3:Sustainably sourced materials and products
posted by  Bryan Waters  on 

If one sustainably sourced material category does not reach 10 percentage points, can the deficit be made up by another category if it is in excess of 10%?

3
Mon May 20, 2013, 12:48 pm

Casework

NC-2009 MRc7:Certified Wood
posted by  Benjie Herrera  on 

Kindly advise us to help the casework contractor/manufacturer how to prepare the proper format of invoice as required for LEED Documentation with the following components of casework to be assembl

3
Default Avatar
LEED AP BD+C ,Homes,IDC,OM
LEEDuser Basic Member
17 thumbs up
Sat May 18, 2013, 1:41 am

Good to know

General forums
posted by  Ivy Glasgow  on 

Thanks for letting us all know about this. I haven't personally looked into Green Globes, but I do think that exposing the money trail is a good place to start.

10
Independent Architect and Specifier
LEEDuser Basic Member
4 thumbs up
Fri May 17, 2013, 8:40 pm

Building Envelope Commissioning LEED required test methodology

NC-2009 EAc3:Enhanced Commissioning
posted by  Pablo Fortunato Suarez  on 

Our project has included Building Envelope Commissioning as part of the scope of Enhanced Commissioning plan.

2
Fri May 17, 2013, 8:10 pm

Form Questions

Healthcare-v2009 IEQc2:Acoustic environment
posted by  Catherine Blakemore  on 

Tables IEQc2-1 and IEQc2-2: - Does each room/space get listed? - How are storage and mechanical rooms to categorized? Table IEQc2-1: When Space Type "Public Space" is selected, the automatic

2
Fri May 17, 2013, 7:23 pm

LEV discounted parking

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  BABAR MEHMOOD  on 

I am working on Healthcare outpatient clinic in Riyadh.

4
Fri May 17, 2013, 6:12 pm

Deleted Uploads Reviewed

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Jane Long  on 

We have received our construction preliminary review back and we notice that the reviewer in his comments for couple of the credits queried is referring to uploads that we have not provided in our

2
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Thu May 16, 2013, 4:51 pm

Dorm - shared FCU and Controls

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Patrick MacPherson  on 

We have a University Dorm project and it is understood that we would be required to have at minimum 1 control for each dorm room. The mechanical system provided has 1 FCU for every 2 dorm rooms.

10
Director of Operations
WorkingBuildings, LLC
LEEDuser Expert
39 thumbs up
Thu May 16, 2013, 3:52 pm

Stormwater Inspection Checklist - Clarity/Support Needed

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Michelle Bracewell-Musson  on 

I am wondering if we can leave the sections below blank on the Stormwater Inspection Checklist due to only having large open turf/landscape areas and no retention ponds (we have ponds, but these ar

3
Thu May 16, 2013, 12:11 pm

Details on letter stating recycling content

CS-2009 MRc4:Recycled Content
posted by  Michael E. Edmonds-Bauer  on 

I would like to know if someone has some experience with the level of detail the letters from manufactures need to be made.

6
Wed May 15, 2013, 9:45 pm