Topic | Recent |
---|---|
EA P2- ASHRAE 90.1 ComplianceCS-2009 EAp2: Minimum Energy Performanceposted by Rodrigo Perez on Jan 7, 2011, 9:27 am
According to ASHRAE 90.1 should meet a minimum efficiency for the HVAC equipment, and only appear values of efficiencies for Water Source... Last reply: Marcus Sheffer, Jan 11, 2011, 9:07 am |
|
Composite wood: Formaldehyde avoidance, not legal conformancePilot-Credits EQpc21: Low-emitting interiorsposted by Tom Lent on Jan 10, 2011, 9:33 pm
Federal legislation has recently been passed instituting formaldehyde requirements that will mirror much of California Air Resources Board ATCM for formaldehyde Phase 2 (... Last reply: Randal Carter, Jan 11, 2011, 8:48 am |
|
Include City Street?NC-2009 SSc5.2: Site development - maximize open spaceposted by Norma Lehman on Jan 4, 2011, 3:19 pm
we have a project that a city street intersects, we want to claim the small greenspace on the other side of the city street that is part of the project and is owned by the project owner. do we... Last reply: Devon Bertram, Jan 11, 2011, 1:02 am |
|
I Beam SurveyEBOM-2009 IEQc1.1: Indoor air quality best management practices - indoor air quality management programposted by Simon Sue on Oct 18, 2010, 7:38 am
I look through the I Beam program (hope is did not miss out anything) and would like to ask few question here. Q1 : do we need to do 100% survey (I Beam) for project we work on? Last reply: Simon Sue, Jan 10, 2011, 7:50 pm |
|
Stand Alone Central Energy Plant CertificationNC-2009 EAc1: Optimize Energy Performanceposted by Jason Smith on Dec 8, 2010, 8:04 am
We are working on two CEP's and the Owner is considering attempting LEED certification for them. I am looking to clarify how you handle the chiller equipment for the EAp2 and EAc1. Based on the... Last reply: Christopher Schaffner, Jan 10, 2011, 7:39 pm |
|
Can renewable energy sold at a premium rate be applied to EAc1?NC-2009 EAc1: Optimize Energy Performanceposted by Rachel Cook on Dec 3, 2010, 4:40 pm
Although the LEEDUser information for EAc2 is very clear that any... Last reply: Christopher Schaffner, Jan 10, 2011, 7:31 pm |
|
ASHRAE 90.1-2007-G3.1.2.4 fan system operationNC-2009 EAc1: Optimize Energy Performanceposted by Tarek Dalati on Nov 17, 2010, 5:42 am
it s clearly mentioned in this section that the baseline building supply and return fans shall operate continuously whenever spaces are occupied and shall be cycled to meet heating and cooling... Last reply: Christopher Schaffner, Jan 10, 2011, 7:30 pm |
|
FTE for multiple shifts with different start time & end timeCI-2009 SSc3.2: Alternative transportation - bicycle storage and changing roomsposted by Suraj Shah on Jan 5, 2011, 6:27 am
There are different departments with each having multiple shifts, each of the shifts having different start time & end time. (For example, department A has 3 shifts with 1st shift time of 6... Last reply: Tristan Roberts, Jan 10, 2011, 7:10 pm |
|
Defer to Construction Submittal?Schools-2009 SSc9: Site Master Planposted by Greg Hackett on Dec 13, 2010, 10:11 am
Do you need to defer this credit until the construction submittal if SSc7.1 is one of your 4 master plan credits? Thanks. Last reply: Tristan Roberts, Jan 10, 2011, 7:05 pm |
|
WEc3 and water catchmentSchools-2009 WEc3: Water Use Reductionposted by Kaui Lucas on Jan 7, 2011, 10:48 pm
WEc3 This project is the renovation of a government facility. The RFP states that the project will not be LEED registered, or attempt any particular point count. It does ask for... Last reply: Tristan Roberts, Jan 10, 2011, 7:03 pm |