Log in
Forum
Topic

WEc1 Thresholds Tab

NC-2009 WEc1: Water Efficient Landscaping
posted by H M on Apr 3, 2018, 7:59 pm

Within the WEc1 "Thresholds" tab, there is a green button that reads "Submit". Are you supposed to click this button in order for the credit to be ready for review? And/or what is the function of...

Fresh air needs in server rooms for data center

Data-Centers-NC-v4 EQp1: Minimum indoor air quality performance
posted by Jose Antonio Kovacevic on Apr 5, 2018, 10:01 am

Hello,

In order to assess compliance of a Data Center with prerrequisite EQp1 and credit EQc1, I would like to know how we should calculate fresh air needs for the server rooms.

...

ASHRAE 90.1 Appendix G Fan Power Calculator

NC-v4 EAp2: Minimum Energy Performance
posted by Marcus Sheffer on Apr 5, 2018, 10:29 am

7group has updated their baseline fan power calculator to include ASHRAE 90.1-2010, 2013 and 2016 baseline fan power calculations. You can download it for free in the Documentation Toolkit tab....

ASHRAE 90.1 Appendix G Fan Power Calculator

NC-v4 EAc2: Optimize Energy Performance
posted by Marcus Sheffer on Apr 5, 2018, 10:35 am

7group has updated their baseline fan power calculator to include ASHRAE 90.1-2010, 2013 and 2016 baseline fan power calculations. You can download it for free in the Documentation Toolkit tab....

ASHRAE 90.1 Appendix G Fan Power Calculator

CI-v4 EAp2: Minimum Energy Performance
posted by Marcus Sheffer on Apr 5, 2018, 10:39 am

7group has updated their baseline fan power calculator to include ASHRAE 90.1-2010, 2013 and 2016 baseline fan power calculations. You can download it for free in the Documentation Toolkit tab....

ASHRAE 90.1 Appendix G Fan Power Calculator

CI-v4 EAc2: Optimize Energy Performance
posted by Marcus Sheffer on Apr 5, 2018, 10:40 am

7group has updated their baseline fan power calculator to include ASHRAE 90.1-2010, 2013 and 2016 baseline fan power calculations. You can download it for free in the Documentation Toolkit tab....

Sample Site Assessment Plan

NC-v4 SSc1: Site assessment
posted by Levan Natadze on Apr 6, 2018, 3:17 am

Hello,

Has anybody a sample...

Vegetated roofs for Places of Respite Credit

Healthcare-v4 SSc7: Places of respite
posted by María Fernanda Aguirre on Apr 7, 2018, 6:43 pm

Hello everyone: There is a huge hospital in Chile which is in design phase and wants to pursue LEED. The building has not enough space at the ground level but considers a large amount of...

Area not in scope of project

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Carl Rappa on Apr 9, 2018, 4:15 pm

We have a renovation & addition project where the CM wants to do the Option 2: Air Testing to achieve IEQc3.2. A portion of the existing building (an old theatre) was outside of the scope of...

Enhanced Commissioning in District energy Systems (DES) with Combined Heat and Power (CHP) plant

NC-2009 EAc3: Enhanced Commissioning
posted by Ricardo Sá on Apr 11, 2018, 6:55 am

We are certifying a project that is being developed in a site that comprises a District Energy System based on a Combined Heating and Power Plant (...