EAp2, Option 2

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by susan eguia on Feb 23, 2011, 2:41 pm

Hi,
I've got the offline calculator for EAp2. Once completed the eligibility requirements do we still need to input at Energy Star Portfolio tool?
The last step is to calculate the...

Last reply: Jenny Carney, Mar 11, 2011, 3:04 pm

LEED for Schools 2007 EAc1 and LEED Boundary

Schools-2009 EAc1: Optimize Energy Performance
posted by Greg Hackett on Feb 25, 2011, 4:11 pm

Our project contains a new LEED Building (addition) and Non-LEED Building (Existing, not in LEED Boundary). The school is looking into cross-tying the DDC controls (only) for the HVAC system for...

Last reply: Tristan Roberts, Mar 11, 2011, 2:53 pm

Calculation of GES equivalent to REC

EBOM-2009 EAc6: Emissions Reduction Reporting
posted by MAUDE PINTAL on Jan 18, 2011, 9:38 am

The...

Last reply: Jenny Carney, Mar 11, 2011, 2:05 pm

Location

Schools-2009 MRp1: Storage and Collection of Recyclables
posted by Eri Spaulding on Feb 28, 2011, 4:07 pm

Guidelines refer to a "dedicated recycling collection and storage area that is easily accessible whithin the building". I would imagine that most haulers would prefer to have this area located...

Last reply: Lisa Fabula, Mar 11, 2011, 1:33 pm

Shall canopies attched to building include in building footprint

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by Na Xing on Mar 2, 2011, 3:15 am

Hi, Could anyboday help me.
We are working on a factory project. There're more than 1000 square meters canopies attached to main building, designed for loading area.
Shall this area...

Last reply: David Posada, Mar 11, 2011, 12:43 pm

WEp1- Handheld bidet faucets

CS-2009 WEp1: Water Use Reduction
posted by Tapio Peltonen on Mar 10, 2011, 7:26 am

Every toilet stall in the project includes a handheld bidet faucet (or spray) and a lavatory. Are these calculated as lavatory faucets or ignored in the water use calculation?

Last reply: Tapio Peltonen, Mar 11, 2011, 12:34 pm

Deriving Minimum Efficiency Requirements for Baseline Chillers

NC-2009 EAc1: Optimize Energy Performance
posted by heinrich post on Mar 11, 2011, 9:38 am

We are wondering how to interpret the Minimum Efficiency Tables of Chapter 6.8 in ASHRAE 90.1-2007 to model HVAC efficiencies of baseline equipment.
Our baseline building has a floor area...

Last reply: Marcus Sheffer, Mar 11, 2011, 11:57 am

Accepting other testing methods

CS-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Petra Hajná on Mar 11, 2011, 8:07 am

Building materials are required to comply with SCQAMD rules which state...

Last reply: Reinhard Oppl, Mar 11, 2011, 10:09 am

Modeling Snow-Melt Systems

NC-2009 EAc1: Optimize Energy Performance
posted by David Hubka on Mar 11, 2011, 8:12 am

I am modeling a LEED building that includes a snow melt system. The system is served by the building's hot water boiler. This boiler also provides hot water to the coils within the building's air...

Last reply: Marcus Sheffer, Mar 11, 2011, 9:17 am

Dormitory that is No Smoking

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by April Ambrose on Jan 26, 2010, 6:02 pm

I have a NCv2009 project that is a dormitory on a college campus.

This is a case where the reference guide and LEED Online do not seem to match. We have a dormitory project that is not...

Last reply: Tristan Roberts, Mar 11, 2011, 8:58 am