Forum quick links
Average Pressure Differential - New LEED Online Template
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Dan Forino on
In the new version of the LEED online template for this credit, there is a minimum (with doors closed) and average required pressure differential in Pa.
hot water heaters
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Geoffrey Brock on
Do domestic hot water heaters fall into this category? They aren't listed in the reference manual, nor can I find mention of them on this site.
regulated loads and unregulated process loads
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Mahmoud Elgarhy on
What is the difference between regulated loads within offices and unregulated process loads ?
City Bike Share Program
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Hannah Sokol on
Has anyone ever included a City Bike Share Program as a form of public/ alternative trans for this credit?
Do I model part-load curve for the DES default efficiency?
NC-2009 EAp2:Minimum Energy Performanceposted by X. Chen on
The DES guideline (2010) allows us to model DES cooling plant with a COP of 4.4, which includes cooling towers and primary pumps.
What is an "Existing Buiding" for EB:OM?
EBOM-v4 MPR2:Must use reasonable LEED boundariesposted by Davide Filippi on
An existing, old and close building (nobody insiede for years, no heating system working...) can pursue a LEED EB:OM v4 Existing building?
Initial energy model required for M&V?
NC-2009 EAc5:Measurement and Verificationposted by Eamon Geary on
I am working on a large campus project. We are planning on obtaining EA 5 for all eight facilities on the campus. However, we are not doing energy models for all eight facilities.
Existing Building Envelope Wall
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Humphreys on
Project background: The project owner has purchased an unconditioned warehouse with the intent to convert it 100% into a school.
Tennant Space Layout
CS-2009 EAp2:Minimum Energy Performanceposted by Matt Humphreys on
The LEED reviewer for a Core and Shell Office Building has requested the design team to illustrate a hypothetical layout of the tenant spaces to document the potential for Daylighting/Views credits
Brand new building - LEED EB?
posted by Marcio Alberto Casado Pereira on
Is there a minimum "age" that the building needs to have in order to be elegible to pursue LEED EBO&M? Thanks