Topic | Recent |
---|---|
Integrative Analysis of Building MaterialsPilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by Aaron Humbert on Jun 3, 2022, 4:11 pm
This credit is used within our practice to further review and select materials. As more projects pursue the BPDO credits due to more manufacturers and products having EPDs & HPDs, this... Last reply: Bethany Beers, Jul 19, 2022, 12:31 pm |
|
Baseline system typeNC-v4 EAp2: Minimum Energy Performanceposted by Nikos Tsitsikas on Jun 7, 2022, 1:19 pm
Hi all, We are currently working on a project which is a building with two levels - Ground floor level and Level 01. Level 01 is 1,000 m2 and consists of hotel rooms, whereas Ground floor... Last reply: Nikos Tsitsikas, Jun 9, 2022, 12:08 pm |
|
PC MRpc87 FeedbackPilot-Credits MRpc87: Verified Construction & Demolition Recycling Ratesposted by Dan Ackerstein on Sep 8, 2022, 3:45 am
Feedback from the architecture firm and general contractors re: PC implementation in Southern California
Last reply: Michelle Rosenberger, Mar 19, 2024, 12:12 pm |
|
Hotel guestroom lighting power modelingNC-v4 EAp2: Minimum Energy Performanceposted by Camilo Velez on Sep 13, 2022, 3:17 pm
Good afternoon all, We are in the process of modeling an hotel type building, and we are reviewing if we can claim savings due to reductions in lighting power in the guest rooms or if we... Last reply: Camilo Velez, Sep 15, 2022, 6:35 pm |
|
Distribution center, unconditioned spaceNC-v4 EAp2: Minimum Energy Performanceposted by santiago sanchez on Oct 3, 2022, 5:42 pm
Good afternoon all, We are working on a distribution center, most of the project is a merchandise warehouse with automatic systems for the movement of the merchandise, such as shuttle... Last reply: Marcus Sheffer, Oct 7, 2022, 5:20 pm |
|
ventilation of corridors and elevator ante roomsEBOM-v4 EQp1: Minimum indoor air quality performanceposted by Arwid Theuer-Kock on Oct 27, 2022, 4:54 am
Hi all, we have an existing building in Germany where the corridors and elevator ante rooms are not ventilated mechanically. In addition there are also no windows for natural ventilation... Last reply: Daniele De Angelis, Oct 1, 2024, 7:21 am |
|
LEED point adjustment when ASHRAE 90.1-2019 is used as baselineNC-v4.1 EAp2: Minimum Energy Performanceposted by elvin ruya on Nov 3, 2022, 6:45 pm
Is there a direct correlation for LEED points when ASHRAE 90.1-2019 baseline is used instead of 2016? Last reply: Eric Dixon, Mar 18, 2024, 10:21 am |
|
"external" process energy for airports- jet bridges, ground power units, andpreconditioned air unitsNC-v4 EAp2: Minimum Energy Performanceposted by Moses Chong on Nov 15, 2022, 1:22 pm
Hello, I'm working on an airport project expansion project. The LEED coach told us that we have to include the airplane jet bridges, ground power units (GPU) and preconditioned air units (... Last reply: Jamy Bacchus, Dec 6, 2022, 12:19 pm |
|
Total Roof Area vs. Total Applicable Roof AreaCS-v4 SSc5: Heat Island Reductionposted by James Jin on Nov 16, 2022, 10:18 am
Hi all, I'm a little confused about which "Roof Area" to use in the equation for this credit. In the credit requirements, the right side of the equation is Total Site Paving Area + Total... Last reply: emily reese moody, Feb 9, 2023, 12:39 am |
|
Interior blinds for energy performanceNC-v4 EAc2: Optimize Energy Performanceposted by Julio Fernandez Amodia on Nov 25, 2022, 2:49 am
Hi there, I am performing an energy model with large windows in warm weather. It is proposed to use automatic blinds to improve thermal comfort in the positions close to the facade. Blinds... Last reply: Julio Fernandez Amodia, Nov 28, 2022, 1:40 pm |