Topic | Recent |
---|---|
Pre-consumer/post consumer Aluminum Recycled ContentNC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Trey Jones on Jan 22, 2020, 4:10 pm
If the manufacturing process I am involved with consumes aluminum coil to produce our end product can we use the internal scrap percentage of the aluminum reused/reverted at the mill as either... Last reply: Renee Shirey, Feb 10, 2020, 5:03 pm |
|
Is pc98 required to earn pc99?Pilot-Credits IPpc99: Design for Enhanced Resilienceposted by Elizabeth Powers on Feb 12, 2020, 7:01 pm
Can someone clarify if a project needs to have performed the hazard assessment in pilot credit 98 and during pre-design, in order to be eligible for this pilot credit, or does this pilot credit... Last reply: Allison Smith, Jun 28, 2023, 7:01 pm |
|
Exclusion of a multi story parking garage from energy modelNC-v4 EAp2: Minimum Energy Performanceposted by Jeff Wiedmeyer on Feb 22, 2020, 10:57 am
I'm working on a project where the occupied building was designed and engineered by a different a different firm than the 5-story parking... Last reply: Summer Minchew, Feb 24, 2020, 12:01 pm |
|
Green Building Certification Institute OR Green Business Certification Institute?LEED Rating System Selectionposted by Deborah Lucking on Feb 24, 2020, 12:57 pmDeborah Lucking Director of Sustainability Fentress Architects LEEDuser Expert 258 thumbs up February 27, 2020- 12:50 pm I just downloaded one about 2 minutes before I sent in my question to this forum... Last reply: Deborah Lucking, Mar 2, 2020, 5:21 pm |
|
Integrative process phaseNC-v4 IPc1: Integrative processposted by Marion THIBAULT on Feb 24, 2020, 4:04 pm
Hello, Last reply: Catalyst Partners, Feb 25, 2020, 9:00 am |
|
Multiple Cx Agents for the Option PathsNC-v4 EAc1: Enhanced Commissioningposted by Saagar Patel on Feb 25, 2020, 9:52 am
I do... Last reply: Joyce Kelly, Oct 8, 2024, 8:57 am |
|
USGBC Review timelineLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Dina El-Sady on Mar 2, 2020, 10:27 am
How long does it take the USGBC to get back to you after credit submittal ? Last reply: Tiffany Beffel, Mar 2, 2020, 8:20 pm |
|
Outdoor Ice Rink Energy PerformanceNC-v4 EAp2: Minimum Energy Performanceposted by Ralph Bicknese on Mar 11, 2020, 1:31 pm
We are looking at LEED for a multi-purpose sports facility with indoor space and an outdoor ice rink that is not enclosed. Would the outdoor ice rink factor into any energy performance criteria... Last reply: Ralph Bicknese, Mar 11, 2020, 5:16 pm |
|
LEED v4 Waste Monitoring unit of measurement in Truck LoadCS-v4 MRc5: Construction and demolition waste managementposted by Ronnel Flores on Mar 11, 2020, 8:41 pm
Our project's waste quantity was recorded in truck load not in kilograms. This counts as volume? Shall we determine just an average volume for one truck load in any of the units in the calculator... Last reply: Chris Leoni, Jul 20, 2023, 11:19 am |
|
Cafeteria with patio seatingNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Margaret Montgomery on Mar 17, 2020, 6:20 pm
In a cafeteria situation where indoor seating bleeds into patio seating with operable windows and person doors between, I assume we still need a walkoff system? It might need to be the entire... Last reply: Emily Purcell, Nov 1, 2022, 1:19 pm |