Log in
Forum
Topic

Pre-consumer/post consumer Aluminum Recycled Content

NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Trey Jones on Jan 22, 2020, 4:10 pm

If the manufacturing process I am involved with consumes aluminum coil to produce our end product can we use the internal scrap percentage of the aluminum reused/reverted at the mill as either...

Last reply: Renee Shirey, Feb 10, 2020, 5:03 pm

Is pc98 required to earn pc99?

Pilot-Credits IPpc99: Design for Enhanced Resilience
posted by Elizabeth Powers on Feb 12, 2020, 7:01 pm

Can someone clarify if a project needs to have performed the hazard assessment in pilot credit 98 and during pre-design, in order to be eligible for this pilot credit, or does this pilot credit...

Last reply: Allison Smith, Jun 28, 2023, 7:01 pm

Exclusion of a multi story parking garage from energy model

NC-v4 EAp2: Minimum Energy Performance
posted by Jeff Wiedmeyer on Feb 22, 2020, 10:57 am

I'm working on a project where the occupied building was designed and engineered by a different a different firm than the 5-story parking...

Last reply: Summer Minchew, Feb 24, 2020, 12:01 pm

Green Building Certification Institute OR Green Business Certification Institute?

LEED Rating System Selection
posted by Deborah Lucking on Feb 24, 2020, 12:57 pm

Deborah Lucking Director of Sustainability Fentress Architects LEEDuser Expert 258 thumbs up February 27, 2020- 12:50 pm I just downloaded one about 2  minutes before I sent in my question to this forum...

Last reply: Deborah Lucking, Mar 2, 2020, 5:21 pm

Integrative process phase

NC-v4 IPc1: Integrative process
posted by Marion THIBAULT on Feb 24, 2020, 4:04 pm

Hello,
My client wishes to have his project certified in LEED V4.
The project is in the construction phase. However, there are still technical and architectural design studies. Is...

Last reply: Catalyst Partners, Feb 25, 2020, 9:00 am

Multiple Cx Agents for the Option Paths

NC-v4 EAc1: Enhanced Commissioning
posted by Saagar Patel on Feb 25, 2020, 9:52 am

I do...

Last reply: Joyce Kelly, Oct 8, 2024, 8:57 am

USGBC Review timeline

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Dina El-Sady on Mar 2, 2020, 10:27 am

How long does it take the USGBC to get back to you after credit submittal ?

Last reply: Tiffany Beffel, Mar 2, 2020, 8:20 pm

Outdoor Ice Rink Energy Performance

NC-v4 EAp2: Minimum Energy Performance
posted by Ralph Bicknese on Mar 11, 2020, 1:31 pm

We are looking at LEED for a multi-purpose sports facility with indoor space and an outdoor ice rink that is not enclosed.  Would the outdoor ice rink factor into any energy performance criteria...

Last reply: Ralph Bicknese, Mar 11, 2020, 5:16 pm

LEED v4 Waste Monitoring unit of measurement in Truck Load

CS-v4 MRc5: Construction and demolition waste management
posted by Ronnel Flores on Mar 11, 2020, 8:41 pm

Our project's waste quantity was recorded in truck load not in kilograms. This counts as volume? Shall we determine just an average volume for one truck load in any of the units in the calculator...

Last reply: Chris Leoni, Jul 20, 2023, 11:19 am

Cafeteria with patio seating

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Margaret Montgomery on Mar 17, 2020, 6:20 pm

In a cafeteria situation where indoor seating bleeds into patio seating with operable windows and person doors between, I assume we still need a walkoff system? It might need to be the entire...

Last reply: Emily Purcell, Nov 1, 2022, 1:19 pm