MR Credit- 20% of WHAT number for the cutsheets

NC-2009 MRc4: Recycled Content
posted by Denise Domino on Mar 28, 2017, 3:55 pm

Jon Clifford LEED-AP BD+C GREENSQUARE LEEDuser Expert 326 thumbs up March 28, 2017- 10:05 pm Denise—As Erica notes in her March 14 response on the MRc5 forum (http://www.leeduser.com/comment/redirect/71061), the requirement was to upload cut sheets for 20% of the sustainable materials cost (the cost contributing to your MRc4 or MRc5 tally). However, as Michelle points out in that same discussion, the latest versions of LEED Online documentation no longer requires uploading cut sheets. Log in or register to post comments Erin Holdenried Sustainable Design Director Bell Architects LEEDuser Premium Member...

Last reply: Debra a. Lombard, Sep 11, 2017, 5:58 pm

Industry-Wide EPD- error in description?

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Megan White on Mar 29, 2017, 7:40 pm

Hi all,

In the ref guide (p.514), it states that as part of Industry Wide EPD "the manufacturer is explicitly recognized as a participant by the program operator." However, this is the...

Last reply: Hashir Usman, Mar 9, 2020, 11:37 am

Campus project with Central Plant

NC-v4 EAc4: Demand response
posted by Brightworks Sustainability on Mar 30, 2017, 3:29 pm

Our project is a student dorm on a university campus. The campus generates most of its power with their chilled water and co-generation plants and they purchase very little energy from the local...

Last reply: Marcus Sheffer, Oct 5, 2020, 2:32 pm

View Factor 3

NC-2009 IEQc8.2: Daylight and views - views
posted by James Bell on Apr 4, 2017, 4:15 pm

I have seen several references to View Factor 3 and cannot find any definition.

Last reply: Sadhana J, May 12, 2022, 2:42 am

Reclaimed water use

NC-v4 WEc1: Outdoor water use reduction
posted by Ann Runley Carroll on Apr 5, 2017, 9:39 am

If I am using all reclaimed/recycled water, do I still need to use the calculator. Where do I download the calculator? By using reclaimed/recycled water, do I get 2 points?

Last reply: Ashraf Ali Khan Khan, Mar 13, 2018, 7:41 am

plywood "exempt from testing by CARB"

NC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber products
posted by Debra a. Lombard on Apr 10, 2017, 4:56 pm

several products we got from different subs/ suppliers submitted us product cut sheets that indicate that plywood based product is "exempt from testing by...

Last reply: Ryan Harrington, Apr 6, 2021, 4:45 pm

Option 1: Smart-Phone Control

NC-v4 EQc6: Interior lighting
posted by RDK E&S on Apr 13, 2017, 5:16 pm

For option 1, is it acceptable for manual controls to be accomplished via a software interface rather than a physical switch? In the vision for this project, users can control lighting in their...

Last reply: Greg Romanczyk, Jul 20, 2018, 3:51 pm

Ice Makers/Energy Star Compliance

NC-v4 WEp2: Indoor water use reduction
posted by Brendan Isard on Apr 18, 2017, 9:39 am

We have a project that uses water cooled ice machine, but the coolant for the system is provided through a refrigerant through a closed loop system. The production for the ice maker also meets...

Last reply: Dave Hubka, Jul 1, 2024, 4:07 pm

Gross floor area modification

CS-2009 PIf2: Project Summary Details
posted by Silvia Ruiz on Apr 18, 2017, 1:43 pm

Hi

If a project size is modified (the...

Last reply: Edgar Arevalo, May 5, 2020, 12:59 pm

Monitoring and Corrective action plan

Pilot-Credits SSpc55: Bird collision deterrence
posted by Luis Huertas on Apr 21, 2017, 10:14 am

I am working on developing the required monitoring plan, but in conversations with the American Bird Conservation manager, drafting a plan for a new building cannot be drafted in the way the...

Last reply: , Apr 7, 2023, 12:40 pm