Log in
Forum
Topic

Different space types within one project registration?

CS-2009 PIf3: Occupant and Usage Data
posted by Paul Deinhofer on Aug 2, 2016, 5:05 am

LEED v2009 C&S
Our project consists of seven individual LEED projects on a campus site. Each of these seven projects/buildings has several different uses/space types (e.g. mostly office...

Last reply: Paul Deinhofer, Aug 9, 2016, 1:29 am

n/a

NC-v4 SSc4: Rainwater management
posted by Anastasia Makarenko on Aug 2, 2016, 6:55 am

Dear all,
we're planning to install tank for collecting 180% of stormwater from 95 percentile rainfall event. Collected rainwater will be used for irrigation, but there won't be any...

Last reply: Anastasia Makarenko, Aug 3, 2016, 9:08 am

Issue with LEED Forms

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Sara Zoumbaris on Aug 3, 2016, 1:27 pm

A few projects that I am as team member on have recently experienced a LEED Online form issue where information "disappears." I am curious if other folks have had this issue and how have you have...

Last reply: Eric Bautista, Oct 5, 2016, 11:03 pm

Using v4 NPDc5 on LEED ND v2009

ND-v4 NPDc5: Reduced parking footprint
posted by Gwen Corrie on Aug 4, 2016, 4:06 pm

We have a registered LEED ND v2009 project. Our SSLc4 does not comply (we are shy of the needed short-term bike racks and showers). Under LEED NDv2009, you must meet requirements under SSLc4 in...

Last reply: Gwen Corrie, Aug 5, 2016, 12:01 pm

0.5m margin and work-space adjacent to the glassed facade

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Anna Korinkova on Aug 9, 2016, 3:21 am

Hello,
For dayligting simulations, there is usually a 0.5m margin applied around the perimeter of the room, excluding the area from the assessment. In our understanding, this is because of...

Last reply: Anna Korinkova, Aug 9, 2016, 11:53 am

EAp2

NC-2009 EAp2: Minimum Energy Performance
posted by sherif el adly on Aug 9, 2016, 4:18 pm

We are working on a huge project in Riyadh, to meet EAp2 we sould look for a water cooled chiller due to the area of the project and the challenge to reach a COP near to 8 to meet the 10% from...

Last reply: Marcus Sheffer, Aug 16, 2016, 11:55 am

Natural ventilated stairs and lift shaft

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by LEEDme Lorenzi on Aug 17, 2016, 6:06 am

Can natural ventilated stairs and lift shaft excluded from requirements of this credit? If not, how can these spaces comply with this credit? Is required...

Last reply: LEEDme Lorenzi, Aug 25, 2016, 9:38 am

Reuse of laboratory equipment and furniture

NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Isabel Santos on Aug 18, 2016, 9:34 am

Dear all,

We are assessing a renovation project according to LEED v4. The company owning the building will use a lot of equipment (laboratory equipment) and maybe furniture from other...

Last reply: Isabel Santos, Aug 25, 2016, 6:21 am

Factory-Existing Building

EBOM-v4 EAp2: Minimum Energy Performance
posted by VISHESH AGARWAL on Aug 19, 2016, 6:04 am

I am working on the factory existing building project. the machine load is about 3000 kw. when i put all the electricity and other consumption data into energy star portfolio manager and i am...

Last reply: Vishesh Agarwal, Jan 11, 2019, 1:53 am

A material with zero VOC content

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by dia2000@gmail.com dia2000@gmail.com on Aug 23, 2016, 8:05 am

Hello,
We are submitting data about certain materials that has "zero"...

Last reply: dia2000@gmail.com dia2000@gmail.com, Sep 7, 2016, 5:19 pm