Topic | Recent |
---|---|
Buildings with special cooling coditions- BaselineNC-2009 EAp2: Minimum Energy Performanceposted by Alex Parella on Feb 13, 2014, 7:14 am
How could we find a baseline model for an intensely refrigerated building, such as skate / ski indoor pavilion? Last reply: Marcus Sheffer, Feb 14, 2014, 12:59 pm |
|
Project Boundary for Shared ParkingHealthcare-v2009 MPR3: Must use a reasonable site boundaryposted by yanghee pierce on Feb 16, 2014, 5:39 pmin the CI forum and most of my work is in NC and HC; caveat emptor! In the Bird's Eye above, they discuss the construction scope. Is the parking garage part of the same construction project and budget... Last reply: Tristan Roberts, Feb 24, 2014, 9:58 am |
|
LEED BD+C Question- Individual Thermal Comfort ControlsNC-2009 IEQc6.2: Controllability of systems - thermal comfortposted by Farah A. on Feb 16, 2014, 6:22 pm
A project design team has design their new office space with an open office plan and operable windows to provide natural ventilation. The office will have 65 employees, each with their own... Last reply: Lauren Sparandara, Feb 18, 2014, 10:24 am |
|
COC requirementsNC-2009 MRc7: Certified Woodposted by Farah A. on Feb 17, 2014, 12:19 am
Which of the following pieces of documentation are required to demonstrate compliance with MR Credit 7... Last reply: Jason Grant, Feb 17, 2014, 3:16 pm |
|
Costs for on-site renewable energyNC-2009 EAp2: Minimum Energy Performanceposted by Kai Andrade on Feb 19, 2014, 4:27 pm
It is required to factor in the initial equipment installation costs when calculating the annual cost for on-site... Last reply: Kai Andrade, Feb 19, 2014, 9:56 pm |
|
U Value & SHGCNC-2009 EAp2: Minimum Energy Performanceposted by SSN Energy Model on Feb 21, 2014, 1:17 am
Hi, Last reply: Marcus Sheffer, Feb 26, 2014, 1:46 pm |
|
rating system selectionLEED Rating System Selectionposted by Osama Hassan on Feb 28, 2014, 4:12 pm
Dear LEED users Last reply: Susan Walter, Mar 4, 2014, 8:59 am |
|
IAQ TestingNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Kelly Searle on Mar 3, 2014, 12:32 am
I am working on a major renovation project - 11 story office building. Due to the time constraints/cost of flushing we have decided to try for testing. Facts are: Last reply: Ashley Hu, Jun 21, 2018, 11:56 am |
|
Plumbing Commissioning Scope Of WorkNC-v4 EAp1: Fundamental commissioning and verificationposted by Dan Forino on Mar 3, 2014, 1:38 pm
In LEED 4.0 it states that for plumbing all Domestic Hot Water Systems, pumps and controls. Is this saying all plumbing pumps (sewage ejector, domestic water booster, etc) are required or only... Last reply: Gabriela Crespo, Oct 21, 2016, 1:50 pm |
|
ASHRAE formsCI-2009 EAp2: Minimum Energy Performanceposted by Yaser Al Sharif on Mar 4, 2014, 4:51 am
for commercial interior rating system The LEED template requires to upload interactive forms of ASHRAE. Also, it says it is optional. I would like to know if I need to fill these forms. Last reply: Marcus Sheffer, Mar 6, 2014, 10:07 am |