Forum quick links
UCSB - Bren Hall
Pilot-Credits IPpc96:LEED Labposted by Brandon Kaysen on
We are very excited to be wrapping up our third LEED Lab project at UCSB. This ear we are certifying the iconic Bren Hall under Version 4 of the EBO&M rating system.
LEED v2009 Minimum Energy Performance Calculator
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear Concern:- 1.Is the LEED v2009 Minimum Energy Performance Calculator sheet is mandatory for LEED 2009 project submission 2.what is the difference between Revised Section 1 4 Tables (Jan 201
ESv3 checklists
Mid-Rise-v4 EAp1:Minimum energy performanceposted by Sue Bryant on
The EAp1 v4 requirement is to meet ESv3 by completing the thermal enclosure system rater checklist, the HVAC system quality install rater and contractor checklist and the water management system bu
Lighting Power Density requirement for Tenant spaces
CS-2009 EAp2:Minimum Energy Performanceposted by Pedro Urazan on
Hi, Is it required that the Tenants comply in their lighting designs with the Lighting Power Density requirement of ASHRAE 90.1 2007?
ACP for Certified Wood vs Pilot for Legal Wood
posted by Terrapin BrightGreen on
The "LEED 2009 Global Alternative Compliance Paths Credit Table" (http://bit.ly/2ovIELH) does not include an ACP for C&S MRc6 Certified Wood, but there does exist a pilot for Legal Wood (http:/
WE_Cr1 "Outdoor Water Use Reduction": Installation of a well
NC-v4 WEc1:Outdoor water use reductionposted by Francesco Passerini on
Is it possible to install a well specifically to collect groundwater for irrigation to meet the intent of the credit to reduce potable water use for irrigation?
Model Calibration - Margins for Error
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ciaran McCabe on
For a new office building would it be acceptable to use these error margins for an M&V Report.
Hotel Occupancy
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by jupiter luner on
I've determined the occupancy for a hotel project we are working on based upon LEED interpretation 2706606.
Hotel Recycling Note
NC-2009 MRp1:Storage and Collection of Recyclablesposted by jupiter luner on
On a hotel project we are trying to avoid putting two bins within the rooms.