light trespass along major city streets

NC-2009 SSc8:Light Pollution Reduction
posted by  Carrie Laurendine  on 

We have a project along a major city street. the city street lights are very bright.

0

ACP for light pollution reduction

NC-2009 SSc8:Light Pollution Reduction
posted by  Magda Aghababyan  on 

Dear all, In a situation where there are some spot lamps for emergency maintenance that can emit upward lights but used only for max.

0

Lighting in a plant nursery with no opaque surfaces

NC-2009 SSc8:Light Pollution Reduction
posted by  cristina algaze beato  on 

I have a plant nursery that is enclosed with Saran material (translucent). It has lighting that is connected to a timer switch that assures that it will be off at night time.

0

EBOM Compliance Path

NC-2009 SSc8:Light Pollution Reduction
posted by  Jason Cocek  on 

Does anyone know if the Exterior Lighting Option 3 under the EBOM Rating System (nighttime illumination measurements) can be used as an alternative compliance path for the exterior portion of the N

0

Campus lighting calcs at project/lighting boundary

NC-2009 SSc8:Light Pollution Reduction
posted by  Deborah Zimmerman  on 

Our project is a new building being built on an existing campus.

0

Industrial site lighting

NC-2009 SSc8:Light Pollution Reduction
posted by  Adrienn Gelesz  on 

Hi all, A question about industrial sites: According to ASHRAE 90.1- section 9.4.5 Exterior Building Lighting Power, lighting used for the following exterior applications is exempt when equipped

0

Actual exterior Lux reading

NC-2009 SSc8:Light Pollution Reduction
posted by  Stella Stella  on 

Can actual lighting level measurements be used as for compliance for this credit?

1
Wed Jun 21, 2017, 6:19 pm

Temporary lighting fixtures

NC-2009 SSc8:Light Pollution Reduction
posted by  LEED Pro Consultant  on 

Hello, We are working on a project that in a future includes an addition, the LEED boundary for the current project is just in the limit between the 1st building and the addition, for this 1st bu

0

Building operating 24 hours

NC-2009 SSc8:Light Pollution Reduction
posted by  LEED Pro Consultant  on 

Hello, We are working on a project which is an industrial facility that will operate 24 hours, for the interior lighting in the offices area we will reduce the input power, in the manufacturing a

0

Search Light at Prison

NC-2009 SSc8:Light Pollution Reduction
posted by  Dave Hubka  on 

Would a prison search light be exempt from the credit requirements?