Forum quick links
AAA Ballpark field lighting
NC-2009 SSc8:Light Pollution Reductionposted by renee jimenez on
I am working on a AAA Ballpark project. My understanding is that the lighting power density for the external floodlighting is required to comply with a figure of 2.15 W/m2 as it’s been classified
building lighting needs and LEED
NC-2009 SSc8:Light Pollution Reductionposted by Robert Sutton on
If I have parking lot lighting existing on a site that is near our project but outside the LEED boundary I assume that will not be required to be incldued in Light pollution calcs.
Allowance calculation with overlapping categories
NC-2009 SSc8:Light Pollution Reductionposted by Jens Apel on
These questions are in regard to exterior lighting power calculation. I am fine with the general approach and calculation.
correction to FAQs
NC-2009 SSc8:Light Pollution Reductionposted by Tristan Roberts on
GBCI brought to my attention a correction that needed to be made to our FAQs.
Covered Parking
NC-2009 SSc8:Light Pollution Reductionposted by Kerrie Racicot on
Hi All, My project consists of a large parking lot where all interior parking spaces are located under solar canopies and perimeter parking spaces are uncovered.
Automatic shutoff system
NC-2009 SSc8:Light Pollution Reductionposted by Magda Aghababyan on
We have a site with 3 product buildings and a small separate canteen building .
Parameters for the site illumination model
NC-2009 SSc8:Light Pollution Reductionposted by Salanson Paul-Eric on
We are working on the site illumination model to measure compliance with the light trespass requirements.
Indoor lighting and working between 11 pm and 5 am.
NC-2009 SSc8:Light Pollution Reductionposted by Lise Dannesboe on
We are working with an office building which has requirements for providing working stations between 11 pm and 5 am.
Definition direct line of sight
NC-2009 SSc8:Light Pollution Reductionposted by Lise Dannesboe on
I tried to fiend a definition of "Shield envelope openings that have a direct line of sight to non-emergency luminaires".
LEED SS 8 credit language...
NC-2009 SSc8:Light Pollution Reductionposted by Rick Alfandre on
Regarding the interior light requirements: We have an office building that is not intended to be in use during the 11pm to 5am period, therefore we will have automated controls w/ manual overide an