exterior lights in enclosed courtyard

NC-2009 SSc8:Light Pollution Reduction
posted by  Erin Holdenried  on 

I have a project where the only exterior lights are within a courtyard that is surrounded by the building on all sides, 4 storys tall. Would the project still have to submit a photometric plan?

0

Hotels achieving this credit?

NC-2009 SSc8:Light Pollution Reduction
posted by  Nelina Loiselle  on 

Has any one worked on/heard of a hotel project that was able to achieve this credit?

0

SSc8 for Multiple buildings

NC-2009 SSc8:Light Pollution Reduction
posted by  Marcio Alberto Casado Pereira  on 

We are trying to pursue this credit as a campus credit.

0

Sports Field Lighting (floodlighting) power densities

NC-2009 SSc8:Light Pollution Reduction
posted by  Ameet AA  on 

I am working on Football Club Academy project based on LEED NC 2009 and AGMBC 2011.

0

light trespass on parking

NC-2009 SSc8:Light Pollution Reduction
posted by  Emmanuel Pauwels  on 

Our Project has a LEED boundary that crosses a parking lot. This means that half of the parking lot is within the leed boundary and the other half is outside the leed boundary.

0

SS CREDIT 8:LIGHT POLLUTION REDUCTION- UPLIGHT ALLOWANCE

NC-2009 SSc8:Light Pollution Reduction
posted by  JUNE KOO KANG  on 

I have a adjustable fixture mounted on the ground to uplight the tree. The initial fixture lumen above 90 degrees from nadir is 0 which is full cut off fixture.

0

Photometrics

NC-2009 SSc8:Light Pollution Reduction
posted by  Saju Varghese  on 

Can photometric plan be created with trees in it to avoid the leakage of light pollution? Thanks.

0

Facade lighting

NC-2009 SSc8:Light Pollution Reduction
posted by  Jens Apel  on 

I do not understand if facade lighting is allowed and under what circumstances.

0

Boundary Lights: Not Allowed?

NC-2009 SSc8:Light Pollution Reduction
posted by  Nowfal Kunju Muhammed  on 

If project uses boundary lights (even near to boundary also), it is very difficult to comply the credit requirements. Is there any solution to this issue?

0

Changes in site lighting fixtures due to Value Engineering

NC-2009 SSc8:Light Pollution Reduction
posted by  Amit Ahiel  on 

I'm working on a project that already submitted for Preliminary Design review.

0