Forum quick links
Calculation
NC-v4 EAc7:Green power and carbon offsetsposted by Vitor Tosetto on
Dear All, I have a doubt about calculation of quantity of REC. I believe you can help me. Using the Example 1 (in page 460 of v4) my project will consume 1,98 MWh per year.
Baseline HVAC System Type - for laboratories
NC-v4 EAp2:Minimum energy performanceposted by Carol SR on
Hello! I am constructing a building model which spaces are half offices, half laboratories. The HVAC system chosen is system 5 (packaged VAV with reheat) for all building, since it is considered a
Published data on Base Building in leiu of CBECS
CI-v4 EAc6:Green power and carbon offsetsposted by Aaron Dahlstrom on
The credit requirements ask tenants to scale their carbon offsets / REC purchases based on CBECS data, if a tenant energy model is not available.
Apartment flush-out
NC-v4 EQc4:Indoor air quality assessmentposted by Mike Henderson on
I'm not an engineer or designer, but I have a question related to a new apartment I just moved in to. The building is new construction, and only the 4th floor (top floor) is completed.
Uses in project boundary?
ND-Plan-v4 NPDc3:Mixed-use neighborhoodsposted by Sarah Kearney on
Hi Eliot, Do the uses on Appendix 1 need to be within the district boundary? We have a number of uses that will be within the boundaries but there are already some uses around the project boundary
EPR Example
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jenelle Shapiro on
Does anyone have an example of compliant EPR documentation?
EBOM V4 School
Schools-EBOM-v4 SSp1:Site management policyposted by George Dreger on
In creating a Site Management Policy what are the options for maintenance equipment. Is maintenance equipment a prerequisite or credit?
Lead Lined Doors
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Tim Murray on
We have a lead-lined door for a dentist x-ray room. The manufacturer cannot confirm that the particle board core is formaldehyde free.
water cooled chilller
NC-2009 EAp2:Minimum Energy Performanceposted by sherif el adly on
Hi Marcus The building size is mandating to model the baseline with a water cooled chiller and I will compare the baseline with the design which is using HVAC that is (air cooled chiller + ice sto
green power source
NC-2009 EAc6:Green powerposted by sherif el adly on
The client have a solar park in a land adjacent to the land on which the project will be built.