Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Calculation

NC-v4 EAc7:Green power and carbon offsets
posted by  Vitor Tosetto   on 

Dear All, I have a doubt about calculation of quantity of REC. I believe you can help me. Using the Example 1 (in page 460 of v4) my project will consume 1,98 MWh per year.

1
Wed Nov 30, 2016, 3:01 pm

Baseline HVAC System Type - for laboratories

NC-v4 EAp2:Minimum energy performance
posted by  Carol SR  on 

Hello! I am constructing a building model which spaces are half offices, half laboratories. The HVAC system chosen is system 5 (packaged VAV with reheat) for all building, since it is considered a

1
Wed Nov 30, 2016, 3:51 pm

Published data on Base Building in leiu of CBECS

CI-v4 EAc6:Green power and carbon offsets
posted by  Aaron Dahlstrom  on 

The credit requirements ask tenants to scale their carbon offsets / REC purchases based on CBECS data, if a tenant energy model is not available.

1
Wed Jan 18, 2017, 4:29 pm

Apartment flush-out

NC-v4 EQc4:Indoor air quality assessment
posted by  Mike Henderson  on 

I'm not an engineer or designer, but I have a question related to a new apartment I just moved in to. The building is new construction, and only the 4th floor (top floor) is completed.

1
Tue Jan 17, 2017, 5:27 pm

Uses in project boundary?

ND-Plan-v4 NPDc3:Mixed-use neighborhoods
posted by  Sarah Kearney  on 

Hi Eliot, Do the uses on Appendix 1 need to be within the district boundary? We have a number of uses that will be within the boundaries but there are already some uses around the project boundary

1
Thu Dec 1, 2016, 5:39 pm

EPR Example

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Jenelle Shapiro  on 

Does anyone have an example of compliant EPR documentation?

0

EBOM V4 School

Schools-EBOM-v4 SSp1:Site management policy
posted by  George Dreger  on 

In creating a Site Management Policy what are the options for maintenance equipment. Is maintenance equipment a prerequisite or credit?

1
Tue Jan 17, 2017, 9:18 pm

Lead Lined Doors

Healthcare-v2009 IEQc4:Low-emitting materials
posted by  Tim Murray  on 

We have a lead-lined door for a dentist x-ray room. The manufacturer cannot confirm that the particle board core is formaldehyde free.

1
Wed Dec 21, 2016, 6:09 pm

water cooled chilller

NC-2009 EAp2:Minimum Energy Performance
posted by  sherif el adly  on 

Hi Marcus The building size is mandating to model the baseline with a water cooled chiller and I will compare the baseline with the design which is using HVAC that is (air cooled chiller + ice sto

1
Thu Dec 1, 2016, 5:40 pm

green power source

NC-2009 EAc6:Green power
posted by  sherif el adly  on 

The client have a solar park in a land adjacent to the land on which the project will be built.

1
Thu Dec 1, 2016, 7:10 pm