Epoxy mortar for anchoring rebar in concrete
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Anna Okviana on
Hai, my project use epoxy glue for anchoring rebar from brick wall to column and slab in indoor area. Does it must meet LEED requirement for adhesive and sealant?
Sliding Scale
Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protectionposted by Kristina Bach on
I wish that this Pilot Credit had some sort of sliding scale built-in for the size of the donation.
Pilot Credit / ID Credit for NC
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Nicholas Bristow on
I am trying to use this on a new construction, residential project. Has anyone been successful in using this credit as a pilot credit or innovation credit for NC?
Hard-lid Ceiling
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Khaled Hamaideh on
Hi In our Project we can't apply deck-to-deck partitions in some janitor rooms so we are looking for (hard-lid ceiling) option.
Design submittal - Tender LOD Documentatio valid for EAp2?
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Velez on
Dear all, I'm am modelling a project that is aiming to get EAp2 at design submittal with Tender Documentation LOD (Level of Detail), meaning there are lots of parameter only defined by technical sp
Can I omit the IP credit since it is stand alone?
NC-v4 IPc1:Integrative processposted by wachira sosaeng on
Generally,in other categories, we have to perform to meet all prerequisites though we don't need any credits in the categories (suppose that we have enough credits that meet our goal.
Narrative explaining compliance of ESC plan with NPDES guideline
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Madhura Dhayagude on
Hi, We are currently in Construction review for a MFHR project based in Philadelphia, PA.
Energy Star compliant attic access doors
posted by Phil Vanderloo on
Can anyone steer me to a good source for a residential attic access door with compliant gaskets and insulation required by Energy Star V3? Thanks
ESC plan
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Imran Hasan on
Hi, Can anyone provide me Construction Activity Pollution Prevention based ESC Plan template. Thanks, Imran
Facilities and alterations. Outside the building
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Mercè Llorca on
There are outside works planned to be done.