multi-occupant space that can be divided in two.
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Saju Varghese on
we have a multipurpose space that can be divided into two space depending on the necessity of the users. Does this require one or two controls?
VRP in the space matrix
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gustavo De las Heras Izquierdo on
Hallo, What does VRP stand for in the column IEQp1 of the space matrix?
Exterior lighting - Baseline Building
NC-2009 EAc1:Optimize Energy Performanceposted by VICTOR MORENO on
To simulate the exterior lighting in Baseline Building, i have to model it according table 9.4.5 of Standard 90.1? Or it is not possible to earn points for exterior lighting systems? Thanks in ad
Bicycle requirement
NC-v4 LTc6:Bicycle facilitiesposted by Veronica Reed on
Hello, we are working on a very small 12 room hotel in a historic landmark building, and were considering moving the project from LEED v2009 to LEED V4, but find some issues with this credit requir
Global Compliance Paths EN 15251
NC-2009 IEQp1:Minimum IAQ Performanceposted by Elodie DUMAS on
Hi, There's several quality level for interior air in EN 15251 : category I to III.
Baseline Envelope NonResi/Resi U-Values
NC-2009 EAp2:Minimum Energy Performanceposted by Emir Pekdemir on
Our project is a multi-family residential project (8 stories) and we have modeled the baseline roof as a Residential, Insulation Above Deck U-Value per Table 5.5-1. We have received a LEED Review
Baseline Envelope NonResi/Resi U-Values
NC-2009 EAp2:Minimum Energy Performanceposted by Emir Pekdemir on
Our project is a multi-family residential project (8 stories) and we have modeled the baseline roof as a Residential, Insulation Above Deck U-Value per Table 5.5-1. We have received a LEED Review
Certifications other than GreenGuard
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Nilda De Coutte on
Hi, we´re working on an office project that is buying all new furniture and we were curious to know if furniture with other international certification like the "EU Ecolable" certificate, was appli
IEQP1 VRP Calculator saying I'm non-compliant
NC-2009 IEQp1:Minimum IAQ Performanceposted by Joe Sechler on
Figured out my question. Please delete
LEED Design submital - First Review
posted by Bridget Brock on
At what point do you make the initial design submittal? I have a project that has the 50% construction documents being currently reviewed by the building department.