Forum quick links
Schools project - large playing fields and open area
Pilot-Credits PC14:Walkable Streetsposted by Helen Kessler on
Would a project with large playing fields and open area have any possibility of meeting this credit requirement?
Selecting system type
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have a project that consists of both residential and non residential units. Per 90.1 2007G3.1.1 exception a. we need to use two HVAC system types for residential and non-residential separately.
car pool requirement vs no car for commuting restriction
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Noriko Nagazumi on
LEED NC SSc4.4 requires preferred parking for carpool or vanpools for 5% of total parking spaces. In our project of a company’s head quarter, there are certain numbers of parking will be installed
CONFUSED WITH FILTER RATING REQUIREMENT.
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by VEL MUTHU on
Hi, I am working on a project where the design scheme follows las described below. There are ERU’s which supplies the fresh air to AHU’s and FCU’s in the project.
Amphitheater Occupancy
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Peter Doo on
Our project is the back stage area of a seasonal outdoor amphitheater concert venue. The venue hosts concerts 35 days per year over a 24 week period.
Public Comments Until 11/13
NC-2009 EAp2:Minimum Energy Performanceposted by Glen Phillips on
USGBC released proposed updates to EAp2/EAc1 for LEED 2009, which at its most basic, requires a minimum 4 points under EAc1.
CO2 sensors that run by battery
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Stella Stella on
Does CO2 sensors that run by battery or powered by PC (USB port) count towards this credit for compliance? Please let me know.
Definition of street frontage
Pilot-Credits PC14:Walkable Streetsposted by Florian Schmidtchen on
What is the right definition of street frontage?
Rehabilitation of a historic building
NC-2009 PIf1:Minimum Program Requirementsposted by Veronica Reed on
Hello we are working on a rehabilitation project for a small hotel being developed in an existing historic building in Quito, Ecuador.
Amphitheater Occupancy for SS and WE
posted by Peter Doo on
Amphitheater Occupancy Project Location: United States Our project is the back stage area of a seasonal outdoor amphitheater concert venue.