Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

90" Flat Screen TV

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Annalise Reichert  on 

I am working on a project that is using 90" flat screen TVs. The Energy Star product database currently does not offer any 90" Energy Star certified flat screen products (largest is about 80").

1
Tue Jun 9, 2015, 8:54 pm

Do Indoor water seal must comply VOC requirements?

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Mauricio Ramirez  on 

Hello. In our project we have a large underground structure to house an IMAX Theater.

1
Wed Jun 10, 2015, 3:06 am

LEED EBOM

Pilot-Credits EQpc78:Design for active occupants
posted by  Lukas Urban  on 

Hi! Can we use this Pilot-Credit in a LEED EBOM project? Our staircase meets almost all the conditions. Thank you.

0

LEVs and Electric Charging Stations to share a spot

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Marisa Britton  on 

We are doing a combined approach, with both LEVs and charging stations. Since there are not location requirements on the charging station, can it be located at an LEV parking space?

1
Fri Nov 27, 2015, 4:51 am

IECc6.1 Hotel Servery

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Glenn Haydu, AIA, LEED AP  on 

Our LEED review for the breakfast servery offered in the hotel is that we do not comply with multi-occupant spaces for lighting controls. We offered occupancy sensor with "forced off" override.

1
Mon Aug 3, 2015, 8:45 pm

Eurovent Certification

General forums
posted by  Shane Geraghty  on 

Hi, I was wondering if anyone could direct me to information regarding AHU Eurovent certification requirements. Thank You

0

Using LEED version 2.2 approval as a precedent

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Judhajit Chakraborty  on 

Hello, I am working on a campus project where there is common parking for the project I am working on and another project which is LEED platinum certified under the 2.2 version.

1
Fri Nov 27, 2015, 4:47 am

Alternative to OA airflow measurement device at Building AHU

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Kristopher Baker   on 

So like many on this thread, i have a LEED CI project that is 1/3 of 1 floor and is served by the base building AHU that is outside the scope and LEED boundary of the project.

1
Tue Sep 8, 2015, 3:36 pm

Zero-lot line project - LEED requirements

CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Mark Frey  on 

Hello, our project is located directly along a public sidewalk. There are several retail tenants in the project.

0

CO2 Monitors in Waiting Room Without 4 Walls

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Michelle Halle Stern  on 

I'm working on a HC interiors project with waiting rooms and nurse stations that have density of 25 people/1000sf, however they do not have 4 walls enclosing the spaces.

1
Tue Sep 8, 2015, 3:29 pm