NC-2009 IEQp1:Minimum IAQ Performanceposted by Gordon Nielson on
I noticed, I cannot enter rooms that require exhaust like restrooms and lockers. Do I exclude them on the excel spread sheet?
Calculating Daily Average for Transient Users
NC-2009 PIf3:Occupant and Usage Dataposted by Randy Weatherly on
Based on the examples presented on this site, the daily average is based on 365 days a year. Is this correct or should it be based on actual days the facility is open for business? Thanks
EQ Space Matrix file on USGBC's website is damaged
posted by John McFarland on
Would someone be able to share the current April 2015 copy of the EQ Space Matrix on this site without linking to USGBC Credit Resources?
Wedding Hall with Dance space Design for Credit 7.1 & 7.2
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Lew Bonadies on
We wish to pursue the credits IEQ 7.1 & 7.2 , the space is auditorium seating with a dance floor for Wedding .(Area - 5300 sq ft , Occupancy 370 People), having office spaces on other floors .
EQc5 - Parking Garages
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Kristopher Lashley on
We have a multi story underground parking structure that is exhausted with 26,000cfm P1, 32,000 cfm for P2 and P3.
Emergency generator fule meter
CI-2009 EAc3:Measurement and Verificationposted by Edwin Wealend on
Hi we have a LEED CI project that is served by an emergency back-up generator that serves multiple floors. Is it really a requirement to meter emergency back-up generator fuel?
measuring heat pump load for system submetering
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by ethan adams on
I have about 35 ceiling- mounted heat pumps throughout the building, and it would be cost-prohibitive to install a separate meter on each one.
Confirmation - perforated sticker sign
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Ian McCall on
Hello, Can someone confirm that an temporary (3 months) publicity perforated window decal installed by the future tenant on the glazed facade is out of the scope of the LEED NC or CS certification
Credit Interpretation Request to support SS p1.
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Marie-France Duthilleul on
When comparing your proposed ESC PLan Is there standard text language / narrative that clearly describs the requirements of Phase 1 and Phase II of the NPDES program.
Data Center PUE & Energy Star Rating
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Charalampos Giannikopoulos on
Is there a correlation of PUE (Power Utilization Effectiveness) and Energy Star rating?