Forum quick links
Campus Registration instead of Block?
posted by Deborah Lucking on
Hello all. I notice on LEED Online that there is now an option to register a new project under "Campus" but not under "Block", which USED to be the way to start the registration process for multipl
IEQp1
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gordon Nielson on
I am having troubles understanding what is a single zone system and a multiple-zone system and how to fill out the forms.
Rating System Path
ND-v4 MPR2:Must use reasonable LEED boundariesposted by Philippa Cameron on
Hi, Can you please help me confirm how we verify LEED ND: Built Project as the suitable rating system path to follow, and set the boundary to accommodate this? The guidance states that: a.
Off-site area counted for two LEED projects
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Anna Korinkova on
There are two buildings to be certified, the same Owner, located on the same campus.
How to deal with a multi-use college residence hall
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Mike Stopka on
I am working on a rather unique residence hall building that has a variety of uses. I am trying to determine what spaces need bike storage and shower/changing facilities.
IEQp1 ventilation cals
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gordon Nielson on
I am calculating the ventilation requirements for a conference room. From the ASHRAE Table 6-1 I selected .06 cfm/ft2 and 5 cfm/person. The room has occupancy of 8 people.
1 year contract?
NC-2009 EAc6:Green powerposted by Erin Holdenried on
In v2.2 is was acceptable to have a 1 yr contract as long as the total green power purchased was equivalent to 2 years of 35% electricity, or year of 70% electricity for exemplary performance.
Bamboo and CS
CS-2009 MRc6:Certified Woodposted by Rosario Lidia Maguey Peña on
Hi! Is bamboo included in credit MRc6 for Core and Shell? We have a Core and Shell project in which the client wants an specific wood finish for the ceiling in the Lobby.
Land disturbed vs. land supporting normal building operation
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michelle Bombeck on
This question has been asked many times and I'm wondering if anyone has some more recent experience with a submittal.
62MZCalc Excel Program
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gordon Nielson on
which is the correct abbreviation for a single duct constant volume system with fresh air introduced at the fan?