Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Task light process load or lighting load?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

I saw some people say task light is process load but sometimes it can be count into lighting power. I wonder is there a good way to treat task light?

1
Fri Feb 27, 2015, 6:16 am

Option 3: Determining HC and NOx emissions

EBOM-v4 SSc5:Site management
posted by  Michelle Raigosa  on 

Although an Equipment Emissions Reduction Calculator is provided, how do we address maintenance vehicles used on site?

1
Fri Feb 27, 2015, 4:30 pm

Information on denied credits?

General forums
posted by  Stephen Buonopane  on 

Has USGBC/GBCI ever published any studies of denied credits? Typical total number for a project?

1
Thu Mar 12, 2015, 7:00 pm

3 glazed panels - LEEDv2009

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  LEED Pro Consultant  on 

Hello, We have a layout configuration in which working spaces (offices) have glazed panels, allowing views to the exterior through other spaces that include also glazed panels.

1
Fri Feb 27, 2015, 7:23 pm

LEED boundary for a railway station

NC-2009 PIf1:Minimum Program Requirements
posted by  Juan Sergio Simborio  on 

LEED NC 2009 Our project is a major railway station in Qatar.

1
Thu Dec 19, 2024, 4:28 am

WEP1 for A project in Middle East

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Ayda Sahaf  on 

The project I am working on is an office building located in middle east. the Washroom water closets all has water jets or a bun gun fixture for washing purpose instead of using toilet paper.

1
Thu Mar 5, 2015, 5:11 pm

Acceptable methods of Glare Control

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Paul Rogers  on 

I know that glare control is a requirement for each window.

1
Mon Mar 2, 2015, 1:29 pm

Bicycle & Changing rooms in basement , 200 yards

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Deepika Parmar  on 

Our project consists of three buildings connected through the basement and is registered under campus development. We are providing bicycle racks and shower changing rooms in the basement.

1
Thu Mar 5, 2015, 5:30 pm

High-Volume vs. Convenience Copier 5,000 pages - CIR 872 Canada

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Lindsey Kindrat  on 

Heads up for those working on LEED Canada NC 2009 projects, CIR 872 ruled 5,000 pages per month as the definition limit for a convenience copier. Ruling provided 2012-06-08.

0

District virtual rate:

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

We have project using district steam. We use DES v2 to calculate the virtual rate based on state averaged electricity (0.084$/kWh) and gas (0.00757$/MBTU).

1
Thu Mar 5, 2015, 5:14 pm