Flush-Out Requirement for a Naturally Ventilated Building
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Eric Carbonnier on
The project is an 8 story residence hall on a university campus. The building is not equipped with a central ventilation system and dorm rooms rely on natural ventilation.
Arrival of tenants in a LEED CS building
posted by Devanand Ragbir on
Our CS building is scheduled for commissioning end of August. Can tenants start outfitting their spaces before this date which will enable their employees to work from September.
Steel extraction location
NC-2009 MRc5:Regional Materialsposted by Tiffany Moore on
I feel like broken record on this topic, because I know I've been through this before.
Pre-Owned furniture
CI-2009 MRc4:Recycled Contentposted by Susan Di Giulio on
If a project is using less than 30% of the furniture budget's worth of pre-owned furniture, and thus not attempting MRc3.2, can that be used towards MRc4 instead?
SRI required testing amounts
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Anna Korinkova on
Hello, could anybody tell me how we can state the number of SRI tests on a project? We intend to place gravel on the roof and provide a concrete parking log.
Understanding LEED Online V4?
posted by Susannah Goddard on
Hi, Wondered if anyone can point me in the direction of any useful guidance which helps explain what is what on the new LEED Online?
Workspace opens to exterior and interior
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Peter Doo on
We have a project that includes a workshop/studio space.
Parking Garage above Non LEED Building
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Kar Kerman on
I'm not sure whether I can (or should) include a parking garage in a project I'm working on. The parking garage is located in an adjacent building and has a separate owner.
Building core concrete floors as a "reused" material?
CI-2009 MRc3.1:Materials Reuseposted by Alex Silber on
Office TI project in a downtown high rise building - rather than installing a finish floor product (e.g.
Solvent free Coating
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Panupant Phapant on
If our project use solvent-freee coating. Do we still need VOCs testing result from our supplier?