CFD based air changes vs mechanical exhaust.
NC-2009 IEQp1:Minimum IAQ Performanceposted by Rudolph Carneiro on
Hey andrew.
Alternative HVAC duct sealant
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by John Covello on
Hi, My contractor is proposing and alternative method to sealing the air conditioning ducts. They would like to use a foam for the duct end that would be air tight.
Excellent Ideas!
posted by Christopher Schaffner on
Nadav, you nailed it here. Four great ideas. Now let's make it happen.
Energy Cost broken out in Lease
CI-2009 EAc3:Measurement and Verificationposted by Sadie Martin on
Hi, we are working on getting the verbiage of the lease correct.
FTE calculation
NC-2009 PIf3:Occupant and Usage Dataposted by Stella Stella on
I have a project where the occupants work on a 12 hour shift. The office is occupied by 97 occupants at 1 shift. So is my FTE = 97 X 12/8 = 145.5? Thanks in advance.
First set of v4 incentives announced
posted by Nadav Malin on
USGBC just elsewhere on LEEDuser that the sunset date for v2009 rating systems will NOT change with the extension.
Project has all 5 Categories
Schools-2009 WEc4:Process water use reductionposted by Sara Zoumbaris on
Hi all, My project has all 5 categories installed (dishwasher with racks, pre rinse etc..), however one of the products is above the maximum limit.
Excellent, excellent, excellent!
posted by John Beeson on
Yes, Nadav! yes. although, the incentives you linked to in your comment here are… well.. meh… But, love your four ideas! Let's go!
Stunned at "backpeddling"
posted by Jodi Smits Anderson on
I was frankly stunned at the announcement that this would be pushed off based on market feedback.
5) Get LEED v4 Tools in Good Shape Quickly
posted by Melissa Wrolstad on
Typically LEED Online is not really "client-ready" until about version 3 of the forms.