CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Andreas Soederberg on
I am looking for a product to replace zinc anti corrosive aerosols. I have two questions: 1. Did I understand the LEED criteria correctly?
Regularly Occupied Space
NC-2009 PIf3:Occupant and Usage Dataposted by Keelan Kaiser on
Would theater/performance dressing rooms and special dedicated "star" dressing rooms be considered regularly occupied spaces with regard to IEQc8.1 and 2?
Rolling Shades
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ema S on
Are rolling shades mandatory when doing the prescriptive method?
LEED EBOM
posted by Srimannarayana NCVK on
Hi, We are working on a project in Dubai. The building is 55% office and 45% hotel.
loading bay inside building footprint
NC-2009 PIf2:Project Summary Detailsposted by Melissa Merryweather on
Hi, I have a garment factory and the loading bay is actually inside the footprint of the building, taking up about 10% of the ground floor area.
LEED Construction Submission
posted by Christopher Strunk on
Had a question from a client on when we can submit the LEED-NC 2009 Construction Submission. Can the submission be made prior to all commissioning being completed and documented?
daylight sensing
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
I wonder whether daylight sensing (lights are dimmed automatically according to daylight) can increase the points a project can obtain in this credit. Table G36.2 doesn’t mention such a system.
Data Center in Portfolio Manager
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Charalampos Giannikopoulos on
How should a Data Center building facility be included in the Portfolio Manager? The building hosts the data center and the supporting offices.
Data Center in Portfolio Manager
Data-Centers-EBOM-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
How should a Data Center building facility be included in the Portfolio Manager? The building hosts the data center and the supporting offices.
Furniture components assembled on-site
CI-2009 MRc5:Regional Materialsposted by Eric Thompson on
We have a project where elements of the furniture are coming to the jobsite and being assembled there.