Forum quick links
Public vs Staff Entries
Healthcare-v2009 SSc4.1:Alternative transportation - public transportation accessposted by Joyce Kelly on
Should we site outpatient Clinic so that both public and staff entries are within 1/8 mile of existing bus stop?
Golf Course Clubhouse Certification
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Johanna Hendricks on
Hello, We have a client that has approached us about the possibility of certifying a golf course clubhouse via LEED EBOM.
Golf Course Clubhouse Project Advice
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Johanna Hendricks on
Hello, We have a client that has approached us about the possibility of certifying a golf course clubhouse via LEED EBOM.
Golf Course Clubhouse Project Advice
EBOM-2009 EAc1:Optimize Energy Performanceposted by Johanna Hendricks on
Hello, We have a client that has approached us about the possibility of certifying a golf course clubhouse via LEED EBOM.
Limited LEED CI boundary
CI-2009 MPR2:Must be a complete, permanent building or spaceposted by Kevin Wilcox on
We have a project where the scope of interior alteration is limited to multiple core restrooms (multiple floors) to incorporate ultra low flow fixtures, minor remodel for compliance with building c
Occupied Roof Areas
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Victoria Civitillo on
Can the areas on the roof that are being used for recreations purposes: restaurant, poolside, lounge, etc. be exempt from the roof square footage calculation?
Pilot credit # 45
Pilot-Credits SSpc45:Site assessmentposted by Devani PERERA on
I do agree with Loic that in France, projects that pursue the french certification HQE would perform a site analysis to assess the needs, opportunities and issues that need the most attention.
Solar Panels
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Amanda Johnson on
Hello, We have a project with Thermal solar panels for hotwater, and I just want to double-check that they can be deducted from the roof-surface for this credit since most of the documents (and pos
0% credit achievement rate?
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Graham Langton on
I'm seeing the credit achievement rate as 0% for this credit. Other achievement rates seem OK. Has nobody achieved this credit? Can this be verified?
Multi-purpose unit for 4-pipe systems
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I'm considering a "Multi-purpose indoor unit for use in 4-pipe systems for the simultaneous production of chilled and hot water by means of two independent water circuits".