Pressure flow rates
EBOM-v4 WEp1:Indoor water use reductionposted by OSCAR DE LA RED on
When introducing the design flow rate values in the indoor water calculator for option 1 calculated water use, we should use the flow rate fixtures values associated to the actual facility pressur
Integrated Design...
posted by Scott Bowman on
Integrated design is going to become even more necessary as we move into LEED v4 to maintain the performance we have been getting in our buildings, and as a new credit in NC, it will require some n
Public vs Staff Entries
Healthcare-v2009 SSc4.1:Alternative transportation - public transportation accessposted by Joyce Kelly on
Should we site outpatient Clinic so that both public and staff entries are within 1/8 mile of existing bus stop?
Golf Course Clubhouse Certification
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Johanna Hendricks on
Hello, We have a client that has approached us about the possibility of certifying a golf course clubhouse via LEED EBOM.
Golf Course Clubhouse Project Advice
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Johanna Hendricks on
Hello, We have a client that has approached us about the possibility of certifying a golf course clubhouse via LEED EBOM.
Golf Course Clubhouse Project Advice
EBOM-2009 EAc1:Optimize Energy Performanceposted by Johanna Hendricks on
Hello, We have a client that has approached us about the possibility of certifying a golf course clubhouse via LEED EBOM.
Limited LEED CI boundary
CI-2009 MPR2:Must be a complete, permanent building or spaceposted by Kevin Wilcox on
We have a project where the scope of interior alteration is limited to multiple core restrooms (multiple floors) to incorporate ultra low flow fixtures, minor remodel for compliance with building c
Occupied Roof Areas
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Victoria Civitillo on
Can the areas on the roof that are being used for recreations purposes: restaurant, poolside, lounge, etc. be exempt from the roof square footage calculation?
Pilot credit # 45
Pilot-Credits SSpc45:Site assessmentposted by Devani PERERA on
I do agree with Loic that in France, projects that pursue the french certification HQE would perform a site analysis to assess the needs, opportunities and issues that need the most attention.
Solar Panels
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Amanda Johnson on
Hello, We have a project with Thermal solar panels for hotwater, and I just want to double-check that they can be deducted from the roof-surface for this credit since most of the documents (and pos