Forum quick links
Can your contractor upload their own MR Calculator?
NC-2009 MRc4:Recycled Contentposted by Miriam Gee on
Does anyone know if the contractor can upload an internal MR Calculator for MRc4-7, or do they have to download the excel spreadsheet from the Credit Resources tab in LEED Online, complete it, and
Short term bicycle storage
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Tyra Sorensen on
Is short term bicycle storage required or just a good/nice idea? Is there guidance on where in a parking garage the bicycle storage can/should be?
Air Purifiers? Dehumidifiers?
EBOM-2009 IEQp3:Green Cleaning Policyposted by Nate Gillette on
Going on a limb here - anyone ever seen these accepted as cleaning equipment? If yes, how did it turn out? Thanks!
metal wall louvers
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
In the building that I’m modeling there are metal wall louvers. Some of them are connected to ductwork (for ventilation), some of them ventilate directly technical rooms.
Assigning credits and tasks in the new LEED Online
posted by WSP Built Ecology on
Hi there! Do you know how you can assign specific people to specific credits in the new LEED Online? I've worked out how to add project members but how do you link them to a specific credit?
Can you pursue LEED CI without any plumbing work?
Retail-CI-v2009 WEc1:Water use reductionposted by Karl Heitman on
If a tenant in our LEED NC Certified building wants to pursue LEED CI but doesn't have any plumbing work due to all bathrooms and process water included in LEED NC, how to you comply for WEp1?
LEED NC 2009 EAc5 Measurement and Verification
NC-2009 EAc5:Measurement and Verificationposted by Jim Gardler on
We have developed a M&V plan for a mixed use Multi tenant high rise with commercial space in the building with the International Performance Measurement and Verification Protocol (IPMVP) as the
Location of Parking Lot
Pilot-Credits PC14:Walkable Streetsposted by Walter Parks on
We are developing an existing Historic building. The building and parking are already set up on the site and the parking lot is on the side of the building but fronts on the street.
Marking credits as Complete
posted by kelly ryan on
I am having difficulty with marking credits as complete. The forms have been filled out and meet the compliance. When in the scorecard page, I click on the Complete icon and nothing happens.
EBOM Credit MRp2 Solid Waste Management Policy
NC-2009 IDc1:Innovation in Designposted by Sara Goenner Curlee on
I am working on a NCv2009 project, and it is considering using MRp2 Solid Waste Management Policy as an Innovation Credit. I have a two part question.