Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Design Condition

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Jerry Scott  on 

I assume both Vpsd and Vdzd should both be taken at a set design condition (cooling or heating).

0

IEQ 4.3 - Mineral-based without integral organic based coatings

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Lilian Seow  on 

Can someone explain that statement in another way? I am trying to explain what that means to tile supplier/manufacturer in China for them to provide a letter.

1
Thu Apr 10, 2014, 1:32 pm

Change the LEED AP person during the project

CS-2009 IDc2:LEED Accredited Professional
posted by  Nándor Kovács  on 

Hello everyone, Is it possible to change the LEED AP person during the project and still earn the credit for it (provided that the 'original' LEED AP has been involved as a principal participant,

0

Fly ash - Pre or Post?

NC-2009 MRc4:Recycled Content
posted by  PAWAN DAHIWAL  on 

Fly ash generated from a thermal plant, used to manufacture bricks.

1
Thu Apr 10, 2014, 1:08 pm
1
Thu Apr 10, 2014, 3:56 pm

Signage Requirements

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Ryan Tinus  on 

Hello. We have a building located downtown in Chicago, and have a question regarding required verbiage for the signage posted at building entrances.

1
Thu Apr 10, 2014, 5:44 pm

Clarification on the San Francisco list

EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Management
posted by  Mark Palmer  on 

Ever since the misprint in the original LEED 2009 EBOM Reference Manual, we here in San Francisco have had to answer a lot of questions from confused LEED APs re: our pesticide lists.

1
Fri Apr 11, 2014, 3:22 am

Pest Prevention by Design guidelines

EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Management
posted by  Mark Palmer  on 

While it is not yet part of the LEED guidelines, you may find our new "Pest Prevention By Design" guidelines useful.

1
Tue Sep 4, 2018, 6:53 pm

IEQc6 vs IEQp1

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  ANDRZEJ ROMANOWSKI  on 

Hi, I work on a CS project ventilated by AHUs and approach both IEQp1/IEQc2 and IEQc6. For getting the IEc6 points both room controllers and operable windows are used.

1
Fri Apr 11, 2014, 9:18 pm

Rainwater re-use

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  ethan adams  on 

We plan to use storage tanks for rainwater collection, then re-use the water in our cooling tower and possibly toilets.

1
Wed Apr 16, 2014, 11:51 am