ASHRAE Forms in LEED Template v4
CI-2009 EAp2:Minimum Energy Performanceposted by Sunayana Jain on
Hi, The LEED template requires to upload interactive forms of ASHRAE. Also, it says it is optional.
Masonry Joint Sealant
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Erin Holdenried on
Hello. Would Masonry joint sealant fall in under the "Other" category for a VOC limit of 420 g/L?
SSc6.2 form
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by wendy zhao on
Hello I'm very confused by the calculation methods about the TSS removal efficiency .
Are the units wrong in ”Indoor Air Quality Assessment” (EQc4)?
posted by Maria Porter on
Option 1 is about flush-out.
Stormwater tank
CS-2009 WEc1:Water Efficient Landscapingposted by BH . on
I have a question regarding the retention tank for the irrigation system.
Achieving Green Power in the UK
CS-2009 EAc6:Green Powerposted by Carine Guenand on
Has anyone achieved this credit in the Uk? And do the REC/contract to be in place at the time of handover to the client? The building will not be occupied straight away.
Bike Racks and project boundary
Retail-NC-v2009 SSc4:Alternative transportationposted by Paladino "Team" on
In NC-Retail 2009, for SSc4.2, the number of secure bike racks / storage spaces is based on "project square footage". Is this building SF?
To fill in credit form table 2
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Catharina B on
Hello On our project has been decided to use the total budget method to demonstrate that we achieve this credit. On wall we used ceramic tiles.
Naturally Ventilated building - Hot and Humid Zone A1
NC-2009 IEQp1:Minimum IAQ Performanceposted by LEED Pro Consultant on
We are looking to certify a naturally ventilated project NC-v2009 (bus terminal) that is located in a Hot and Humid zone.
Group project boundary for two buildings that are separated
posted by Kent Liu on
Hi all, I am pursing a multiple building submission for 2 NC buildings.