Forum quick links
Expedite CIR ruling
posted by H.K.C.B. Heendeniya on
Dear Community, Is there a way to expedite the CIR ruling process?
Temporary Parking Question
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Todd Bundren on
My project is a group project on a college campus with 2 phases. We are going to be certifying each phase separately.
GHG Emissions in Pilot Credit EAC27
Pilot-Credits PC27:Reconcile Designed and Actual Energy Performanceposted by Arda Moltay on
Pilot Credit EApc27 requires the eventual MV evaluation report to include an evaluation of: "Avoided GHG emissions compared to the EA Credit 1 baseline." We're doing a CS2009 project and we have n
Housekeeping exhaust rate
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by FABIO VIERO on
We are developing a building which has a cleaning storage rooms and all the cleaning products are closed/sealed except for temporary use (1 use per day). We want to persue the Ashrae 62.1-2007 by u
Distance measurement submission
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Magda Aghababyan on
Hi, In the submission LEED asks to submit a site plan to scale with the walking path marked on it.
Washable filters
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Noriko Nagazumi on
Is the "replace all filtration media immediately prior to occupancy" required for washable filters as well? Thanks in advance
ASHRAE 90.1-2010 VRF Requirements
NC-v4 EAp2:Minimum energy performanceposted by Rudolph Carneiro on
Does anyone know wether or not evaporator input power should be included in the efficiency calculation of a VRF system?
AHSRAE 90.1-2010 VRF Requirements
NC-2009 EAp2:Minimum Energy Performanceposted by Rudolph Carneiro on
This is a V4 doubt but I cant imagine anyone is monitoring the V4 forum so i decided that posting it here would be more effective. Does anyone know wether or not evaporator input power should be i
Change of credits for Regional Priority
Schools-2009 RPc1:Regional Priorityposted by Alan Viale on
Hi, I've just seen on this website: http://www.usgbc.org/rpc/LEED-CS/v2009/pe/ that credits for RP category for Peru have changed.
SCAQMD Rule 1113-Table of Standards1 - Amended June 3, 2011
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Lilian Seow on
Two issues: 1.