Major refurbishment - existing building

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Alicia Freire  on 

Can this credit not be achieved in an existing building where one floor (not the top floor) is being assessed and the existing roof will be left untouched?

1
Fri Nov 1, 2013, 1:51 pm

Labs21 Issue

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Eddie Cuevas  on 

I am working on a LEED-EBOM project that does not qualify for a Portfolio Manager rating due to the fact that lab space makes up more than 10% of the building area.

1
Tue Nov 5, 2013, 2:48 am

definition of 'mixed use'?

NC-2009 PIf2:Project Summary Details
posted by  emily reese moody  on 

Hi, We have a CS project that will have retail space on the ground level floor, and office space for the rest of the building.

1
Fri Nov 1, 2013, 9:41 pm

Area calculation for trees

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Muhammad Faisal Azizullah Jaffar  on 

I have a project where trees, shrubs and groundcovers will be used. While the area coverage of shrubs and groundcovers is relatively easy to calculate, trees are a bit more tricky.

1
Sun Nov 3, 2013, 3:13 am

Calculating materials costs to achieve MR credits

NC-2009 MRc3:Materials Reuse
posted by  Remigio Antonio Rancan  on 

Hi all, i don't find Table 2 indicated in LEED reference Guide for green BD+C p. 337. Can anyone help me? Thanks a lot.

1
Sun Oct 27, 2013, 5:00 pm

N, Qunit (tons) and Refrigerant Charge (Rc) in lb/ton

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Adi Negara, LEED AP BD+C  on 

Dear All, I'm trying to fill the EAc4 form, but I don't understand about HVAC&R at all. I'm not too sure what is N, Q and Rc column meaning.

1
Wed Feb 5, 2014, 12:27 am

Can gas metering only qualify for EAc3.2?

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  James Doyle  on 

Under LEED EBOM 2009 I am considering attempting metering under credit EAc3.2 for a 200,000 sq. ft.

1
Thu Nov 7, 2013, 8:42 pm

Residential Kitchen Equipment

Healthcare-v2009 WEc4.3:Water use reduction - food waste systems
posted by  Rosemary Ziemann  on 

If the project is using residential grade kitchen equipment (this is for a licensed Nursing Home) - therefore we do not have a food waste disposer systems or pulpers, extractors, etc.

1
Mon Oct 28, 2013, 8:02 pm

Systems Manual for Enhanced Commissioning

NC-2009 EAc3:Enhanced Commissioning
posted by  Tom Nichols  on 

We received a comment that we need to include system single-line diagrams in our systems manual. Can anyone clarify what the GBCI wants?

1
Mon Oct 28, 2013, 8:25 pm

Option 2 documentation?

NC-2009 MRc5:Regional Materials
posted by  Erica Downs  on 

Has anyone received any feedback yet on Option 2 documentation?

1
Tue Nov 19, 2013, 4:20 am