Forum quick links
Excessive storm rainwater runoff
NC-2009 SSp1:Construction Activity Pollution Preventionposted by John Covello on
Hello, I have a question regarding silt and run off. Our project is located in Phuket Thailand.
Is the project located outside the U.S. and using a local equ...
NC-2009 SSc1:Site Selectionposted by Noriko Nagazumi on
Hi. The LEED Online form for this credit was updated recently and now international projects have to "Provide documents identifying how the local equivalent used is equivalent to the referenced".
check-offs on SSc5.2 form
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Denise Dauplaise on
The current version of the form for this credit has the statement "The LEED project does not include any buildings, hardscape, roads or parking areas built as part of the project on portions of the
Removal of Office/Open Office Trash Cans
EBOM-2009 MRp2:Solid Waste Management Policyposted by Zane Lichtneger on
I'm proposing to remove all office trash cans in the hopes to encourage more recycling.
Testing sampling location for independent ventilation system
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Lilian Seow on
Each of the 400+ residential suites is designed with an independent stand-alone ventilation system. According to the air testing requirement in pp.
Public vs Private Lavatory Faucet
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by LUCY WILLIAMS on
Hi, I am inquiring about the difference between private lavatory and public lavatory faucets.
Case 1 Option 2 Excessive stormwater runoff
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by John Covello on
Hello, We are pursing Option 2 for this project. Our stream channel protection will handle a 10 year storm event. How does the credit handle excessive storms, 50 or 100 year events?
Gravel Roads as BMPs
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Paula Hernandez on
Hi Everyone, A project I'm working on is factory on a rural setting. All roads and parking lots are gravel. Does this account as pervious paving?
Description of quality assurance procedures.
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Rudolph Carneiro on
I recieved a comment for a project of mine and dont really know what they want exactly.
Commingled Waste Diversion Tracking Sheet
NC-2009 MRc2:Construction Waste Managementposted by Lee Kellogg on
Where can I find a working Commingled Waste Diversion Tracking Sheet. The samples I've found don't have working macros.