0.8 gpf water closets, no urinals

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Sam Farmer  on 

We have a project that is considering a 0.8 gpf water closet. The project is an existing building renovation and we do not have ADA clearance space for the addition of urinals.

1
Sun Nov 3, 2013, 6:40 pm

Documentation

CI-2009 MRc2:Construction Waste Management
posted by  Jose Ng  on 

We have planned to give the excess material to workers. How can we document it? Best, J.Ng

1
Fri Oct 11, 2013, 3:36 pm

Reuse of Roof Deck But Not Steel Joists

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Laura Long  on 

We are renovating a former grocery store into a satelitte campus building for a university. We will be reusing the roof deck but not the roof joists.

1
Mon Nov 4, 2013, 3:21 am

Open Space Requirements Required to be Native?

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  LUCY WILLIAMS  on 

I am having a difficult time understanding if the requirements of this credit allow non-native vegetation to count towards open space?

1
Thu Oct 10, 2013, 3:57 pm

Donation of Land

ND-v2009 SLLc8:Restoration of habitat or wetlands and water bodies
posted by  Karyn Rodrigues  on 

Hi Eliot, My project has a "permanent protection area" (qualified as Conservation Easement).

1
Thu Oct 10, 2013, 7:11 pm

Shower Use by Non-FTEs

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Michelle Rosenberger  on 

Shower calcs only look at FTEs and not transients or visitors. I have an office building TI that is putting in a fitness center with a locker room scenario.

1
Mon Nov 4, 2013, 4:42 pm

Determining Baseline case

NC-2009 WEc1:Water Efficient Landscaping
posted by  Erika Duran  on 

I had the following question which I am sending to the GBCI as well but I wanted to consult with you guys to understand what you have seen based on experience: Establishing the baseline case- WEc

1
Sun Nov 3, 2013, 6:36 pm

Reused material

NC-2009 MRc4:Recycled Content
posted by  Erin Holdenried  on 

If a project is not pursuing MRc3, can reused material count towards MRc4 instead?

1
Thu Oct 10, 2013, 5:40 pm

LEED-CI 2009 SSc1 Option 2 Path 10

CI-2009 SSc1:Site Selection
posted by  Nicholas Vreeland  on 

We are attempting SSc1 Option 2 Path 10 for a CI project within a CS registered building. My question is that the form provided for this credit automatically populated 30 sec.

1
Mon Oct 14, 2013, 7:47 pm

Level of Detail for space usage type table

NC-2009 PIf3:Occupant and Usage Data
posted by  Noriko Nagazumi  on 

Hi all, What level of detail do you generally use for completing the space usage type table? Do you write down room by room? Do you bundle up rooms by floor?

1
Fri Oct 11, 2013, 2:19 pm