NC-2009 MPR 2 - new distinct building attached to existing
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Kenneth Ruby on
We are designing a new 116,000 SF, 8 story University building to house distinct academic departments.
Rc in split unit system
NC-2009 EAc4:Enhanced Refrigerant Managementposted by ABDALAZIZ ZAQOUT on
I have a split units that their Rc is above 5 mentioned in the Reference Guide, but fortunately my average refrigerant atmospheric impact is lower than 100 (according to use efficient centrifugal c
Counting Entrances for Transit Served Locations
ND-v2009 SLLp1:Smart locationposted by Michael Smithing on
I understand that each entrance to non-residential buildings must be counted separately.
CI vs NC
posted by Dale Dunnet on
Our client has a 100 year old building in the downtown area of a small town.This building will be a total interior demolition (exterior walls/ windows remain).
VAV minimum for Ds
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by George Kotsis on
Hello all, I am completing the 62mzcalc spreadsheet during heating mode. VAV box minimums are typically 30% for systems with reheat.
No new parking with LE and FE spaces
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Denise Dauplaise on
Our project is on a campus, where there is an existing parking ramp nearby. There will be "no new parking" used on SSc4.4.
EAp2 Sample L4 Narrative
CS-2009 EAp2:Minimum Energy Performanceposted by Thomas Newbold on
Are there any sample narratives available on LEEDUser to satisfy Upload L-4? "Provide a detailed narrative describing the intended credit Files: approach, including energy efficiency measures that
How to Claim Credits for Natural Ventilation in Multifamily High
NC-2009 IEQc2:Increased Ventilationposted by zhao yongqing on
What is the methodology for LEED projects to claim credits (if possible?) for natural ventilation in dwelling units?
charging columns
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
In the courtyard of the building that I’m modelling two charging columns for electric vehicles are going to be installed. Shall I consider them as process energy?
Using the Group EAP2 Spreadsheet
posted by Robert Wichert on
Does anybody have any experience with the Excel spreadsheet for group energy analysis?