Mechanical enclosure non-roof?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Nicole Kimoto on
Can we include the concrete paving provided in our project as part of the non-roof area?
Sustainable Sites credit in LEED for Homes
posted by radwa rostom on
Hi all, I have an inquiry in the sustainable sites category. in 1. site stewardship, point d "build on a lot of 1/7 acre or less, or 7 units per acre" what does "lot" mean?
Military installation with male dominated population
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Joanna Switzer on
I am part of a team working on a multiple building complex LEED project at an Army Infantry installation.
SS7.2 question about form
Schools-2009 SSc7.2:Heat Island Effect—Roofposted by John Paul Chulliyil on
Hi all, I am in the middle of working on the SSc7.2 roof for and a bit confused. We are using a High albedo material covering 100% of the roof.
Development density - site area
NC-2009 SSc2:Development Density and Community Connectivityposted by John Edwards on
I have a project that has 30 stories of above-grade office/retail/parking structure and 3 levels of below-grade parking.
Product Catalog or Brochure of Building Equipment.
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Sangmin An on
Hello, I have a few questions regarding how to demonstrate the amount of refrigerant charge. The questions are as below. 1. Situation We are preparing design phase review.
1-year-24-hour data in the UK
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Alicia Freire on
Hello I am working on a project in the UK and we are struggling to get the 1 year 24 hours rainfall.
Low Impact Development and green infrastructure strategies
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Alicia Freire on
Hello When following the ACP, the LEED manual states that attenuation must be undertaken through Low Impact Development (LID) and green infrastructure strategies.
Compliance with Table 7.8 - Service hot water
NC-2009 EAp2:Minimum Energy Performanceposted by Ward Miller on
As far as we read the Mandatory Requirements of ASHRAE 90.1 required by EAp2, performance requirements must meet the specifications of Table 7.8.
Peak transient numbers in bicycle rack calculation
Schools-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Shivani Langer on
As discussed briefly above: even though the credit language states bicycle racks are to be calculated for only student and staff, LEED online form includes transient numbers in its calculations.