Forum quick links
Is it possible to modify a LEED boundary already registered?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Mauricio J Perez R on
Dear all, We are developing the design phase of a LEED Project which is already registered in the LEED online.
Moveable Walls for Views Calculations?
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Joanne Sawatzky on
Are moveable walls considered open or closed for Views calculations? I read furniture and partitions are not included: Does furniture need to be included in floor plan when completing views calcul
First in Africa ?
posted by Mike Barker on
We have Africa's first LEED 2009 NC Gold in the bag, as well as Africa's greenest factory ( LEED Silver ).
Baseline system types and building area
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
We have the project of to 250,000 sq ft. The Air conditioned area is only 50,000 sq.ft. The rest is enclosed unconditioned area (No HVAC) of 200,000 sq.ft.
LEED EBOM on Industrial Buildings
NC-2009 PIf1:Minimum Program Requirementsposted by Ricardo Sá on
I am aware that LEED for Existing Buildings: Operations & Maintenance is applicable to any commercial and institutional buildings, however, I would like to hear your opinion whether it is suita
Shuttle takes 10min or less to get to the first bus stop
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Marcio Alberto Casado Pereira on
Hi, I was wondering if I can get this credit if my shuttle stops at a bus stop 10min or less after it departs from the project.
Durable Goods - Furniture
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Sabrina Cescolini on
We are working with a project building that is a large convention center and event hall, with some permanent offices. For MRc2.2.
MPR 6 Compliance through a different Portfolio manager
posted by Vinsu Shah on
In regards to what was briefly discussed in the Q&A portion, will LEED accept access to a different portfolio manager instead of the Energy Star Portfolio Manager?
Sealant VOCs
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Erin Holdenried on
For a product that "does not contain isocyanates, silicone, solvent or acids" does this mean there are 0 VOCs? Or are there other compounds that could be present that contain VOCs?
How do I calculate?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by adi ashkenazi on
Hello I'm working on an exclusive residential project (NC) that contains a resident- only-access pool and gym. In my calculations I considered around 1400 residents and about 10 staff.