NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by CRolim Engenharia on
Hi, I work in a project of a multi-family residential building. I have a doubt to fill item 6.
Entry mat in vestibule w/ tile surround
Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Rebecca Molldrem on
We have a client who will do the entry mat in the main vestibule, but want a band of ceramic tile all the way around it.
Canada-NC 1.0 -- EAc1
posted by Laura Long on
We are going through the third party reviewer portion of the credit and have one final hiccup. A garage type space is heated and conditioned with an energy recovery unit with gas heating.
School addition - LEED Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by padraic o connell on
Hi all, Our project is an addition to a school - LEED NC.
changing prerequisite completed forms
Pilot-Credits EApc67:Energy Jumpstartposted by Linda Francis on
Once you've submitted your project for review, how do you change prerequisite forms?
Rainwater collection
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Heather Holdridge on
I'm assuming the area used for a rainwater cistern within a LEED project boundary is not factored anywhere in the template for this credit -- Is this correct?
Requirements by government agency don't require total cleanup
NC-2009 SSc3:Brownfield Redevelopmentposted by Noriko Nagazumi on
Hi all, We're working on a international project, which is designated as a brownfield site by the local government Is a project still eligible for this credit if it the requirements of the regio
Examples of PI F1, F2 and F3
ND-v2009 PIf1:Development Program and Site Typeposted by Jos Schild on
Due to the development of BREEAM Neighbourhood Development, I'm looking for the PI forms to see whether we can use them or not for the writing and working of the certification system in The Netherl
Planters and window boxes
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Mike D on
Hi, I was wondering if window boxes or planters can count towards the credit.
WE C1, Option 2, Path 2 submittal requirements
NC-2009 WEc1:Water Efficient Landscapingposted by SmithGroup BG+LU FW on
If a site will have no irrigation installed (permanent or temporary) is one still required to complete the baseline and design case information as part of the submittal requirements (tables WE c1-1