Refrigerant Management Plan

EBOM-2009 EAp3:Fundamental Refrigerant Management
posted by  Robert Calloway  on 

I have completed a Refrigerant Management Plan for a building and when I go to upload it to the EAp3 credit there is nowhere to place it.

1
Tue Oct 15, 2013, 11:36 am

Community Center on Park Land

NC-2009 SSc1:Site Selection
posted by  Paula Jarrett Nasta  on 

If you are putting a Community Center and Fire Station Building on a site that is currently a portion of a park is that project exempt from the 'do not build on previous park land" criteria and th

1
Sun Nov 3, 2013, 3:37 am

LEED Boundary

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Antwon Williams  on 

I would like to know what determines the site boundary for capturing the 90% anual rainfall total. Does the treatment area have to be the entire site boundary?

1
Thu Apr 18, 2013, 9:12 pm

Rainwater collection and reuse on campus

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Maya Karkour  on 

Hello, Our project is a new building on a school campus.

1
Thu Apr 18, 2013, 1:14 pm

Technical rooms on the roof

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Hanne Goa  on 

Hello. We have 4 technical rooms on the roof of the building where the thought is to have vinyl flooring. Do this flooring also have to meet Floorcore standard?

1
Thu Apr 18, 2013, 5:36 pm

Electric furniture

CI-2009 MRc5:Regional Materials
posted by  Mathilda Jonsson  on 

Hi all I'm wondering about electrical supplies for some furniture, i. e height-adjustable work desks. Are these electrical components also included in the regional requirement?

1
Thu Apr 18, 2013, 5:06 pm

MULTIPLE BUILDINGS CONNECTED AS ONE.

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Daniel Rohe  on 

I am trying to put together a water fixture inventory and calculations for an office complex that has three buildings built in different years that are attached as one building.

1
Thu Apr 18, 2013, 12:19 pm

Sorting Cactus

NC-2009 WEc1:Water Efficient Landscaping
posted by  Omar Elrawy  on 

I have two questions, Should I categorize Cactus as a tree or as a shrub? Can I set all base-case to sprinkler, then the design case is to be dripping?

1
Thu Apr 18, 2013, 11:09 pm

LEED Homes vs LEED NC for Dormitory with Faculty Apartments

LEED Rating System Selection
posted by  Timothy Casper  on 

I am working on a dormitory building at a boarding school that will also include faculty apartments. The student dorms will be comprised of single and double bedrooms.

1
Fri Apr 19, 2013, 1:28 am

Cafeteria/Training Room: Regurlarly Occupied Area?

NC-2009 PIf3:Occupant and Usage Data
posted by  Silvia Ruiz  on 

I recently received a LEED Review asking me to include the caferia/training room into the regularly occupied area of my project, claiming that "only support areas such as copy rooms, storage, mecha

0