Forum quick links
Core&Shell Process Load on a Manufacturing Facility
CS-2009 EAp2:Minimum Energy Performanceposted by Lourdes Salinas on
Hi everyone, We have a C&S Major Renovation Manufacturing Facility project. The building is doubling in size and some adjustments will be performed to the envelope of the existing building.
Documents/ details needed for alternative compliance path
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Mark Meaders on
We have a project with a central plant with chillers that has R-11 refrigerant.
Trace Modeling for Carrier Infinity-V speed heat pumps ??
NC-2009 EAc1:Optimize Energy Performanceposted by Robert Sutton on
Planning to use Carrier variable speed heat pumps split systems on a project and I am looking for data files to assist in this. The manufacturer rep is not aware of anything that can help.
waterless urinals
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Emmanuel Pauwels on
We have tried to comply with this credit using waterless urinals and dual flush toilets with a very low flush (3L/435L)
Existing Parking conditions
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by John Stouffer on
The existing conditions of the site have 55 existing parking spaces. Our plans show that we are taking out 14 parking spaces and adding 16 addition spaces, totaling 71 parking spaces.
Building Automation System (BMS)
NC-2009 EAp2:Minimum Energy Performanceposted by Marco Antonio on
Hello We are developing a project of air conditioning a building certified LEED NC 2.2 and wonder if all Fancoletes and fans small (about 200), should be interlidados in the building automation sys
Adjoining Historic Buildings
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Brownsville Area Revitalization Corporation on
We are working to restore two commercial/residential historic buildings with the intent of achieving LEED certification.
Regional industrial practices
NC-2009 EAp2:Minimum Energy Performanceposted by Valentin Grimaud on
Dear community, I am facing a problem meeting the eap2 credit since my project presents almost 80% energy cost related to process.
Determining FTE, PTE
NC-2009 PIf3:Occupant and Usage Dataposted by Catherine Blakemore on
How are the FTE and PTE numbers derived? The project is for a surgical addition.
Space listings & supporting documentation
Healthcare-v2009 IEQc2:Acoustic environmentposted by Catherine Blakemore on
I am not familiar with this credit so bare with me. Does each space (room) have be be listed on the IEQc2 form? Is there spread sheet format that can be used? Any recommendations will be greatly