handling overflow

ND-v2009 GIBc8:Rainwater management
posted by  Crystal Wu  on 

As per LEED requirements in this credit, up to X percentile rainfall events should be retained on-site, through infiltration, evapotranspiration and reuse, and must not be discharged into surface w

1
Tue Mar 12, 2013, 5:58 pm

Green Cleaning credit achievement rates

EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessment
posted by  stuart carron  on 

Thanks LEEDuser for publishing credit achievement rates - should be very helpful for the industry to address gaps. I find it curious that the achievement rate for this performance monitoring credit

1
Tue Mar 19, 2013, 4:19 pm

ITE Study for use on Residential Projects

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Iris Amdur  on 

Hi, I have a Residential project that is adding new parking and has a local maximum parking requirement but no minimum parking requirement.

1
Wed Mar 20, 2013, 10:44 pm

Integrative process

General forums
posted by  Eddy Santosa  on 

Because I can't comment directly, I just would like to suggest the change on the language for the IPc1.

0

If we go to the option 2 in SSc7.1, do we need SRI>29 for road.

CS-2009 SSc7.1:Heat Island Effect—Nonroof
posted by  Somsak Jidmon  on 

If we are going to go with option 2 of the credit SSc7.1 - puting more than 50% of car parking to under the building structure.

1
Thu Mar 7, 2013, 7:44 pm

Small HVAC Equipment & 0.5 lb rule

NC-2009 EAp3:Fundamental Refrigerant Management
posted by  Nathan Lee  on 

Our project has removed all CFC based refrigerants on the main HVAC equipment. However we have some small HVAC equipment that use CFC Refrigerants.

1
Mon Mar 25, 2013, 5:56 pm

Registration time limit for B&C rating system?

LEED Rating System Selection
posted by  Christina Nybergh  on 

Is there a time limit to register a project under B&C rating system? My project is already finished and the tenants have moved in, but we would like to pursue Retail NC.

1
Thu Mar 7, 2013, 1:00 pm

Zone Isolation (HVAC 6.4.3.3.4)

NC-2009 EAp2:Minimum Energy Performance
posted by  Alex Parella  on 

Our office building (Major Renovation v3 2009), located at 3C climatic zone, doesn’t exceed 25,000 ft2 of conditioned floor area, but has more than one floor. Different users will have their own s

1
Thu Mar 14, 2013, 4:42 pm

Benchmark or industry standard for equipment not listed in table

Schools-2009 WEc4:Process water use reduction
posted by  Ameet AA  on 

Where can I find a benchmark or industry standard for the below equipments in kitchen.

1
Wed Jul 24, 2013, 5:32 pm

Space Usage Type - Regularly and Unconditioned SF

NC-2009 PIf3:Occupant and Usage Data
posted by  Courtney Royal  on 

Hello! Under the Space Usage Type table, how do you fill in the table for those spaces that are exempted from IEQc8.1 and 2, but are still conditioned?

1
Thu Mar 7, 2013, 8:46 pm