Minimum number of equipments to be audited

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  ESD Singapore  on 

Hi all, The project that we are working on would like to go pursue this credit using ASHRAE level 2 commissioning audit path. However, this project has a large quantity of AHUs and FCUs (approx.

1
Fri Feb 1, 2013, 12:51 pm

exhaust systems for hazardous gas and chemical use areas

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Adam Targowski  on 

All hazardous gas and chemical use areas have to have appropriate ventilation systems.

1
Fri Mar 22, 2013, 5:54 pm

Off-site Native Vegetation

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Phil Meyer  on 

Can anyone clarify how we can achieve SSc5.1 through the use of off-site native vegetation? Do we use an alternative compliance approach and submit forms from LEED EBOM for this same credit?

1
Fri Feb 1, 2013, 3:15 am

Same Fixtures Different Usage Groups

CI-2009 WEc1:Water Use Reduction
posted by  padraic o connell  on 

Hello, I have assigned two fixture usage groups within a building; A daycare usage group (12 FTE) and General Office usage group (140 FTE).

1
Fri Mar 22, 2013, 1:10 pm

Mixed-use model for residential

CS-2009 EAc1:Optimize Energy Performance
posted by  charles bell  on 

RE: LEED CS EAc1 We need input on how to model the 6th floor residential portion of our mixed-use building? Our specific concern is the lighting. Any help is appreciated. Thanks--

1
Thu Jan 31, 2013, 8:52 pm

HCFC 141b For Interior Pipe Cleaning

NC-2009 EAp3:Fundamental Refrigerant Management
posted by  Roberto Meza  on 

Is the complying with the prerrequisite in jeopardy for using HCFC 141b for cleaning the interior of the copper piping previous to installation?

1
Fri Feb 1, 2013, 3:40 pm

dividing project during execution after design final review

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Piotr Nowinski  on 

Hello We are working on the project, which include 3 independent buildings: A, B & C (each 17 stories above grade has own mechanic, energy system and entrances ) and 3 floors underground parkin

1
Fri Feb 1, 2013, 10:45 pm

Underground car parking

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  BH .  on 

Hi, we are dealing with new LEED hospitality project. The project will be constructed in two stages (two towers), with common parking under both of them constructed in the first stage.

1
Thu Mar 21, 2013, 2:29 pm

Elevators - Energy Consumption - Sources

General forums
posted by  Marcio Alberto Casado Pereira  on 

Hi, Is there any kind of consideration in order to estimate Elevators Energy Consumption, manuals, specific Leed procedure or so? Thanks in advance.

1
Fri Feb 1, 2013, 5:19 pm

collecting recyclables together

NC-2009 MRc2:Construction Waste Management
posted by  Adrienn Gelesz  on 

If plastic and paper is collected together in the same container and taken to a common facility where both are recycled, does this count as commingled waste or can we track this as one waste catego

1
Fri Feb 1, 2013, 9:00 pm