Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

The What vs. The How

General forums
posted by  Rob Watson  on 

I believe that "The What" (credit requirements) is less important to the success of Version 4 in the market compared to “The How." By “the How,” I mean the submittal requirements and the tools f

0

Suggestion for an alternative transition between V3 & V4

General forums
posted by  Rob Watson  on 

What I think would be better for the transition would be to allow an alternative compliance pathway for the materials credits ("Backwards compatibility"-a bit more on this in a separate post) and h

0

leed online v3 user interface

General forums
posted by  sam Alfassy  on 

i can not make the leed online interface show normalyy - all text is alligned to the right side of the screen. I am working with a left to right interface (for hebrew language) i have downgraded my

1
Fri Dec 14, 2012, 5:11 pm

submit to leed-online compliance

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ron Dean  on 

Good day, i wonder what is the time that I can submit the M&V plan for credit 5.1. May I submit it when the construccion is finished with the rest of the credits for C&S certification or I

1
Mon Dec 10, 2012, 4:30 pm

NC Innovation credits from EBOM, design or construction review?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  SmithGroup BG+LU FW  on 

If an ID credit is first submitted during preliminary review for design credits and the reviewer's comments require client input that will take longer than 25 (working) days for us to document can

1
Mon Dec 10, 2012, 8:31 pm

Why aren't all v4 credits and prereq's available for comment?

General forums
posted by  Joseph F. Bridger  on 

I was confused to see that I could not post comments for LEED v4 for all of the credits and prereq's I had assembled comments for. Why are some available and some not?

1
Mon Dec 10, 2012, 7:46 pm

Attempting to comment on LEED v4

General forums
posted by  Kathleen Roberts  on 

It seems the section that my organization wishes to comment on is not open for comment, although that certainly was not clear in our review of the draft.

0

GCBI project review cost

NC-2009 PIf2:Project Summary Details
posted by  Michael Kros  on 

I submitted a project for D&C review. The project is a 25,000 SF addition to an already LEED certified building of 60,000 SF.

1
Mon Dec 10, 2012, 10:10 pm

EBOM for Residential Condominium: Possible?

LEED Rating System Selection
posted by  Gary Shlifer MS, LEED AP BD+C, Homes  on 

Does anyone have any experience or know of a successfully certified Highrise Residential Condominium building? As we all know the reference guide mentions certification for residential highrise, bu

1
Thu Dec 13, 2012, 10:06 pm

Reuse of Light Fixtures and Mechanical Vents

CI-2009 IDc1:Innovation in Design
posted by  Caro Wilbanks  on 

I am wondering if the reuse of light fixtures and mechanical vents has ever been used towards an ID credit. I understand that these divisions are not counted towards any of the MR credits.

1
Fri Dec 14, 2012, 7:56 pm