OFF Site Application

CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Gayle Borst  on 

So without my knowing it, the contractor had laminate applied off site to some cabinets- our LEED Reviewer flagged the fact that we had left out contact adhesive but had included the laminate on ou

1
Sat Nov 24, 2012, 3:19 am

For Assemblies - What is the Location of Extraction?

CI-2009 MRc5:Regional Materials
posted by  Melissa Wrolstad  on 

My client has a chair which was manufactured within 500 miles of the project site. The chair is composed of foam (5%), plastic (2%), wood (13%) and steel (80%) by weight.

1
Mon Nov 4, 2013, 3:49 pm

What to measure?

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Marcio Alberto Casado Pereira  on 

We are working on a multiple building campus, it's a residential project.

1
Tue Oct 16, 2012, 8:42 pm

Amount of recycling generated

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  SmithGroup BG+LU FW  on 

Has anyone found baseline data for amount of recycling generated in an office?

1
Mon Nov 5, 2012, 7:11 pm

Non-domestic VOC resources

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Bruce Maine  on 

I know this question has been asked before but I'm unable to locate the official USGBC interpretation for acceptable resources for VOC calculations for non-domestic projects.

1
Mon Nov 26, 2012, 5:50 pm

EAp2 Prescriptive Path- Renovation and Addition

NC-2009 EAp2:Minimum Energy Performance
posted by  Eric Elizondo  on 

EAp2- Option 2 Prescriptive Method The current project consists of an existing building that is being renovated along with a new addition to the building.

1
Wed Oct 17, 2012, 2:34 pm

Shampoo Bowls

Schools-2009 WEc3:Water Use Reduction
posted by  Ara Massey  on 

I am working on a vocational high school that has shampoo bowls in the cosmetology classroom. Do these fixtures need to be included in WEc3 and if so as what type of fixture? Thanks!

1
Wed Oct 17, 2012, 4:34 pm

For Assemblies - what is the location of extraction?

NC-2009 MRc5:Regional Materials
posted by  Melissa Wrolstad  on 

My client has a chair which was manufactured within 500 miles of the project site. The chair is composed of foam (5%), plastic (2%), wood (13%) and steel (80%) by weight.

1
Fri Nov 23, 2012, 5:41 am

Option 1 Zoning for a CI- Facility with out of scope areas withi

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Saju Varghese  on 

Good afternoon. We are currently submitting templates for a University facility.

1
Thu Oct 25, 2012, 1:53 pm

Formaldehyde Emissions in Plywood Cabinets

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Andy Kallam  on 

I am currently considering submitting a plywood product for cabinetry that does contain Urea Formaldehyde adhesives.

1
Thu Oct 18, 2012, 1:44 am