Ventilation of a Backup Diesel Generator Closet

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Michael Wironen  on 

We have a small mechanical equipment room that contains a backup diesel generator. It is being ventilated to remove exhaust and excess heat.

1
Fri Dec 21, 2012, 7:13 pm

One product, multiple IEQ credits?

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Katrina Morgan  on 

Should flooring adhesives take credit under IEQc4.1 or IEQc4.3, or both? Thank you!

1
Wed Sep 5, 2012, 8:21 pm

LED Site Lighting

NC-2009 IDc1:Innovation in Design
posted by  buddy pribish  on 

Seems like a no brainer - substituting LED light fixtures in our parking lot will cut energy consumption by 80%. This does not seem to be covered in other LEED credits.

1
Wed Sep 5, 2012, 7:36 pm

Gym with Daylight Provision

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Grace Ming  on 

We have a LEED-CI project with a small Gym. The gym has the daylight provision with full height window. Do we need to provide the photo cell sensors at the gym as well? Thanks.

1
Thu Sep 6, 2012, 2:18 am

Regularly unoccupied rooms

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Alicia Freire  on 

Hello, I am working on a data centre which, as it is common in this type of buildings, has a “Crisis room”.

1
Thu Sep 6, 2012, 6:09 pm

Which rating system

LEED Rating System Selection
posted by  Magnus Stagnäs  on 

Our client is developing an office project consisting of three office towers with a common open plan ground floor and two common basement parking floors.

1
Fri Sep 21, 2012, 8:12 pm

Base Building ASHRAE 62 Compiance

CI-2009 IEQp1:Minimum IAQ Performance
posted by  breeze glazer  on 

IEQc1 requires confirmation that the building services have been designed in accordance with ASHRAE. A statement from the mechanical engineer is required to demonstrate this.

0

Multiple Units - Shared Returns

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Mike oliva  on 

Our design has four Dual Duct VAV units that share common plenum return that is recirculated thru both hot and cold deck of each unit. Each unit has it's own OA intake.

0

Appurtenances

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Katherine Ann Resurreccion  on 

I'm reviewing a project that will install skylight for basement parking. The skylight and the building footprint is inside the project boundary.

1
Sat Sep 8, 2012, 1:32 pm

Energy star Equipment documentation

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Kalyan Nishtala  on 

Hi, While documenting energy star rated products for EAc1.4, the rated power is to be used. My understanding is that this is the name plate power for the appliance.

1
Sat Sep 8, 2012, 2:26 pm