Forum quick links
Tradable or untradeable surface?
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
On the site of the building which I’m modelling there is a floodlight that is placed on the external ground and that lights the external facade of the building.
Irrigation sub-metering - water tank
EBOM-2009 WEc1:Water Performance Measurementposted by Anna Korinkova on
Our project will build a water tank which will provide enough water to irrigate 100 % of our greenery.
Construction Preliminary Review as Final
posted by Joseph Greene on
We selected the split review process and recently received Construction Preliminary Review comments.
public non-potable water
CS-2009 WEp1:Water Use Reductionposted by Noriko Nagazumi on
Hi, WEc1 Water Efficient Landscaping allows the use of "water treated and conveyed by a public agency specifically for nonpotable uses" for the water saving calculations.
VOC Limit for vinyl laminated gypsym ceiling tiles
CI-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by soha yamani on
My project is going for LEED CI 2009 ,, i can't find the VOC limit for vinyl laminated gypsym ceiling tiles ,, any idea what is the maximum limit ??
Shower and changing facilities
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Sandra Holmström on
Shower and changing facilities should be provided for 0,5 % of FTE occupants.
Air Recirc in DOAS/VRF Systems
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by eric jendro on
This credit states to exhaust hazardous spaces with no air recirculation.
CCFL- Cold Cathode Fluorescent Lamps
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Luis Leal on
CCFL- Cold Cathode Fluorescent Lamps could be excluded from the calculations? The manufacture just inform this:"Low content of mercury, 20% less than that of CFL. How should I proceed?
Whole System Integration Process Guide not referenced
Pilot-Credits PC60:Integrative Processposted by Heather DeGrella on
Does any body know why this pilot credit does not use the reference standard, titled “ANSI/MTS Whole System Integration Process Guide (WSIP)-2007 for Sustainable Buildings and Communities.” It was
chiller reference values for energy modeling and compliance form
CS-2009 EAp2:Minimum Energy Performanceposted by Adam Targowski on
I am working on a project which is equipped with air-cooled chillers. According to ASHRAE 90.1-2007, Appendix G, table G3.1.3.7.