Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EnergyStar for Server Equipment

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Marco Abdallah  on 

We have an office building with some server rooms (around 40 kW).

1
Tue Jun 26, 2012, 4:09 pm

Greenguard GGPS.001

Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systems
posted by  Chris Sanders  on 

If a gypsum board wall material has been certified under Greenguard GGPS.001, does this mean that it has achieved the testing and product requirements established in IEQ Credit 4.6?

1
Wed Jun 6, 2012, 4:26 pm

Documentation for views

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Mike D  on 

Hello, I would like to know if the drawings of the spaces and views should be provided for all floors or are the drawings for one of the floors of the building sufficient?

1
Wed Jun 6, 2012, 2:44 pm

What Makes A ZEV?

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Janna Nash  on 

This question is concerning how to determine if my building occupants' vehicle is a ZEV. Can someone tell me if the term ZEV means a Calif. Air Resources Board Smog Score of 10 out of 10?

1
Thu Jul 12, 2012, 5:36 pm

Industrial Maintenance Coating VOC Limit for Concrete Masonry

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  J Douglas Dietrich  on 

We have a project in which we must apply an Industrial Maintenance Coating for Concrete Masonry. We want to be sure that we specify a coating that will be within the LEED acceptable VOC limits.

1
Fri Jun 8, 2012, 5:09 pm

Update on the survey calculator

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Trista Brown  on 

Thanks to everyone that posted about their troubles with the commuting survey calculator.

0

LEED 2009 PI form 3

General forums
posted by  Denise Dauplaise  on 

Thanks for all the hints folks. I clicked "none" on the lease part, and it still didn't say completed. Then I went back and put in 0s for any areas that were blank/not used.

0

Source control of low-toxicity products

EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additions
posted by  Patrick Culhane  on 

I was hoping that someone could clarify the extent of the measures we need to adopt to ensure the "the proper handling of low-toxicity products." For example, would we need to ensure that carpets

1
Tue Jun 12, 2012, 6:59 pm

Addenda to ASHRAE standards

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Jens Apel  on 

Edit: question has already been answered in February 2012 here: http://www.leeduser.com/credit/CI-2009/EAp2 Didn't find it before, sorry for any confusion. Dear all, on several spots in the Ref Gu

0

Hard Surface Flooring that is not FloorScore

EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additions
posted by  Michelle Rosenberger  on 

Our project is pursuing this credit and intends to install hard surface flooring that is entirely comprised of solid wood and ceramic tile.

1
Mon Nov 26, 2012, 8:44 pm