Forum quick links
LEED ND - Construction Credits
posted by Shakir Ismail on
Help needed!...Is there a list of construction/design credits for LEED ND projects on LEED Online? If yes, I need a list of LEED ND (Stage 3) credits/prerequisites pertaining to construction only.
Mixed Use Residential Baseline 90.1-2004
NC-2009 EAc1:Optimize Energy Performanceposted by Ruben Porter on
*Moved to NCv2.2 Credit EAp2
Historical data with building and tenant changes
EBOM-2009 IOc3:Documenting sustainable building cost impactsposted by Tiffany Moore on
I'm trying to clarify how or what to provide in terms of historical data for an O+M project with a performance period that will begin at day 1 of occupancy in an NC project.
AGMBC Part 2
posted by Diana Carro on
Hello. Do you know when LEED Online functionality and Certification (and Registration) Fees will be available for Part 2 of the AGMBC? Thanks!!
Chilled Water Pumps, Primary/Secondary
NC-2009 EAp2:Minimum Energy Performanceposted by Aaron Dahlstrom on
ASHRAE 90.1-2007 Sec G3.1.3.10 requests that users specify pump power of 22 W/gpm, with a primary / secondary pumping system and variable flow on the secondary side.
RAVOCs
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Eduardo Guzman on
Our contractor would like to use a flat pain that gives both a VOC content measurement and a RAVOC content measurement.
Floodlight
NC-2009 EAp2:Minimum Energy Performanceposted by Ameet AA on
2. Lighting requirement from ASHRAE 90.1-2007 Appendix G?
Can I use CONTROL as an energy saving strategy??
CS-2009 EAp2:Minimum Energy Performanceposted by Esteban Undurraga on
Dear all: We have an specific question related to the Whole Building Simulation of an office Building. The electricity distribution company established a maximum limit of energy use for the buil
Detailed Plant Simulation
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Chilufya Lombe on
Hi, we have a project with a certain number of 'back up' systems for air conditioning.